Contractor · Specialty (solar, fire, telecom)

Power Home Solar, LLC - Applicant

31 building permits since 2019 in Pender County, NC — $650,512 in reported job value over 16 permits that state one.

Building permits
31
Reported job value
$650.5K
Active
2019–2021
Latest permit
Jul 1, 2021

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Pender County, NC31

Permits by year

By issue date (application date where there is none).

01020
17
201920202021
View as table
YearPermits
20194
202017
202110

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar30
  • Additions17
  • Battery storage10
  • Electrical8
  • Remodels6
  • Generators1

Permit types

As the building departments classify them.

  • Residential Additions17
  • Residential Electrical - Electrical.27
  • Residential Alteration and Repair6
  • Residential Electrical Stand Alone Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 1, 2021Residential Alteration and Repair18 roof mounted modules, grid tied 6.12kw solar and battery installation on an existing residence.Pender County$59,556
Jun 9, 2021Residential Alteration and Repair18 roof mounted modules, grid tied 5.76k.W. solar and battery installation on an existing residence.Pender County—
May 5, 2021Residential Alteration and Repair18 panels, roof mounted modules, grid tied, 5.76KW solar & battery installation on existing residencePender County$57,288
Apr 22, 2021Residential Additions14 roof mounted modules, grid tied 4.48kw solar and battery installation on an existing residence.Pender County—
Apr 22, 2021Residential Alteration and Repair13 roof mounted modules, grid tied 4.16k.W. solar and battery installation on an existing residence.Pender County—
Apr 21, 2021Residential Alteration and RepairInstallation of 13 roof mounted solar modules 4.16kw grid tied to an existing structurePender County—
Apr 7, 2021Residential Alteration and Repair13 roof mounted modules, grid tied 4.16 kW solar and battery installation on an already existing residence.Pender County—
Feb 26, 2021Residential Additions18 roof mounted modules, grid tied 5.76kw solar and battery installation on an existing residence.Pender County—

Permit status

Where its permits stand, as the departments report them.

  • Completed15
  • Expired10
  • Void3
  • Cancelled2
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

Power Home Solar, LLC - Applicant — Building Permits & Contractor Profile | Buildstats