Contractor · Electrical

NIPPER ELECTRIC

31 building permits since 2019 in Chesapeake city, VA and Chesterfield County, VA, across 2 counties — $142,370 in reported job value over 31 permits that state one.

Building permits
31
Reported job value
$142.4K
Active
2019–2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Chesapeake city, VA30
  • Chesterfield County, VA1

Permits by year

By issue date (application date where there is none).

01530
28
201920242026*
* 2026 is year to date.
View as table
YearPermits
20191
20242
2026 (YTD)28

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical31
  • EV chargers7
  • Electric meters3
  • Pools & hot tubs3
  • Generators2
  • Solar1

Permit types

As the building departments classify them.

  • Residential Electrical Permit26
  • Commercial Electrical Permit4
  • Residential Electrical1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2026Residential Electrical PermitINSTALL (12) 0 - 30 A, (2) 31 - 60 AChesapeake City$4,000
Oct 9, 2026Residential Electrical PermitREPLACE METER BASE / INSTALL (16) 0 - 30 AND (2) 31 - 60 AMP CIRCUITSChesapeake City$4,000
Sep 29, 2026Commercial Electrical PermitINSTALL (2) 0 - 30 AMP CIRCUITSChesapeake City$7,000
Sep 29, 2026Residential Electrical PermitREPLACE 200 AMP METER BASEChesapeake City$2,000
Sep 18, 2026Residential Electrical PermitEV/Tesla Type 2Chesapeake City$1,000
Sep 11, 2026Commercial Electrical PermitEV Charger - (1) 31-60 Amps CircuitsChesapeake City$1,400
Sep 11, 2026Commercial Electrical Permit(2) 0-30 Amps CircuitsChesapeake City$1,400
Jul 20, 2026Residential Electrical PermitInstall 20 AMP with disconnect to pool pump, including bondingChesapeake City$3,000

Permit status

Where its permits stand, as the departments report them.

  • Closed26
  • Issued5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.