Contractor · Electrical

Manukov

31 building permits since 2022 in Los Angeles city, CA.

Building permits
31
Reported job value
—
Active
2022–2023
Latest permit
May 16, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA31

Permits by year

By issue date (application date where there is none).

01020
18
20222023
View as table
YearPermits
202213
202318

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical31
  • Solar22
  • Roofing2
  • Additions2

Permit types

As the building departments classify them.

  • Electrical31

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 16, 2023ElectricalEplan: We will be installing a 15.2KW DC/ 12.3KW AC solar PV system wLos Angeles City—
May 8, 2023Electrical[eplan] Install 14.175 kW DC roof mounted PV system with 27 kWh energyLos Angeles City—
Apr 26, 2023Electrical[EPLAN] INSTALLATION OF NEW ROOFTOP MOUNTED PV SYSTEM TO AN EXISTING SLos Angeles City—
Apr 5, 2023Electrical(EPlan) PV1 PC for installation of roof mounted solar panels. PV systeLos Angeles City—
Apr 5, 2023Electrical[EPLAN] PV1 PLAN CHECK FOR ADDITION TO EXISTING PV SYSTEM. ADDITION SYLos Angeles City—
Apr 3, 2023Electrical[EPLAN] PV1 plan check for addition to existing pv system. New systemLos Angeles City—
Mar 29, 2023Electrical[EPLAN] PV2, Roof mounted solar system using 7 microinverters interconLos Angeles City—
Mar 28, 2023ElectricalPV2 plan check for installation of roof mounted solar panels. PV systeLos Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.