Contractor · Electrical
LA SOLAR GROUP INC
3,813 building permits since 2013 in Los Angeles city, CA; San Diego County, CA and Marin County, CA, across 21 counties — $4,014,438 in reported job value over 368 permits that state one.
- Building permits
- 3,813
- Reported job value
- $4M
- Active
- 2013–2026
- Latest permit
- Aug 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA3.5K
- San Diego County, CA48
- Marin County, CA45
- Camarillo city, CA38
- Sacramento city, CA28
- Norwalk city, CA21
- Mountain View city, CA13
- Vista city, CA11
- Sacramento County, CA9
- Davis city, CA9
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 15 |
| 2014 | 55 |
| 2015 | 329 |
| 2016 | 464 |
| 2017 | 373 |
| 2018 | 479 |
| 2019 | 448 |
| 2020 | 612 |
| 2021 | 742 |
| 2022 | 204 |
| 2023 | 49 |
| 2024 | 9 |
| 2025 | 14 |
| 2026 (YTD) | 18 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical3.4K
- Solar972
- Roofing308
- Battery storage233
- Additions54
- Plumbing23
- Water heaters19
- Electric meters6
- EV chargers5
- HVAC4
Permit types
As the building departments classify them.
- Electrical3.3K
- Bldg-Alter/Repair188
- RESIDENTIAL45
- Single Family26
- RESIDENTIAL ROOFTOP SOLAR SYSTEM23
- Building Misc - Photovoltaic System (PV)11
- ELECTRICAL11
- PHOTOVALTIC RESIDENTIAL9
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 20, 2026 | Duplex | 0kw Solar PV System, 27 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, | Sacramento | $7,500 |
| Aug 11, 2026 | Single Family | EPC - EV Charger Permit: Installation of 1 EV charger. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Reside | Sacramento | $300 |
| Jul 22, 2026 | Solar | Install 46 PV modules (20.24KW) with 46 micro-inverters. SYMBIUM-project_e2122535-1a7c-4412-884f-2dac0d8f5ee5 | Burbank City | — |
| Mar 20, 2026 | Electrical | Install 47 pv modules (21.15kw) with tesla inc. Inverters; install 2 ess units on an exterior wall. Symbium-project_89f6cce6-1b94-4209-97b3-297cff983638 | Burbank City | — |
| Mar 11, 2026 | Electrical | Otc) install new flush roof-mounted, low-profile pv solar system. Total solar panel modules quantity: 7, total inverters: 7, 3.15 kw dc / 2.27 kw ac, sq. Ft. Ar | Thousand Oaks City | — |
| Mar 11, 2026 | Roofing | Building Permit | Berkeley City | — |
| Mar 4, 2026 | Roofing | T/o (e) comp, new sheathing as needed, 1-layer 15 no. Felt underlayment, (n) owens corning comp, 29 sqs, slope 5:12 ***manufacturer's specs to be onsite for ins | Huntington Beach City | — |
| Feb 24, 2026 | Electrical | E-plan) adding ess to an existing pv solar system at 13.72 kw (2012-2827-e-0-0-0) 1- tesla powerwall 1 battery, 1- backup gateway | Thousand Oaks City | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated3.4K
- Finaled188
- Issued132
- Completed74
- Active12
- Closed10
- Expired8
- Cancelled3
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- LA SOLAR GROUP
- L A SOLAR GROUP
- LA SOLAR GROUPN INC
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.