Contractor · General building
Joe Dalomba
31 building permits since 2018 in Providence city, RI; Attleboro city, MA and Warwick city, RI, across 6 counties — $3,662,755 in reported job value over 27 permits that state one.
- Building permits
- 31
- Reported job value
- $3.7M
- Active
- 2018–2026
- Latest permit
- Oct 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Providence city, RI8
- Attleboro city, MA4
- Warwick city, RI4
- Central Falls city, RI3
- Pawtucket city, RI3
- Sharon town, MA2
- Cumberland town, RI2
- Bristol town, RI1
- East Greenwich town, RI1
- Newport city, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 4 |
| 2019 | 3 |
| 2020 | 2 |
| 2021 | 6 |
| 2022 | 5 |
| 2023 | 1 |
| 2024 | 4 |
| 2025 | 2 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Windows & doors11
- Remodels10
- Roofing8
- Kitchens7
- Bathrooms6
- New construction4
- HVAC2
- Grading & excavation2
- Demolition2
- Pools & hot tubs2
Permit types
As the building departments classify them.
- Building Permit22
- Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)2
- COMM.2
- RESI.2
- EG Building Permit1
- Roofing Permit1
- Roof Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 18, 2026 | Building Permit | Interior remodeling from a Job Lot into a Church Assembly. | Warwick City | $800,000 |
| Oct 8, 2026 | EG Building Permit | WORK DESCRIPTION Division 02 Existing Conditions Work is associated with an existing deck that forms an extension of the existing breezeway. Division 05 Metals | East Greenwich Town | $5,000 |
| Jul 14, 2026 | Building Permit | Steel Structure Erection. New Roof Beam, columns and footings. Main Permit # 26-2219. Interior Renovations. | Warwick City | $70,000 |
| Feb 4, 2026 | Building Permit | First floor only and basement, bathroom remodeling, kitchen remodeling, new windows, new interior doors, ceramic tile on entire first floor. | Providence City | $80,000 |
| Dec 22, 2025 | Building Permit | Selective demolition including removal of drop ceiling. Removal of carpet, tile and non load bearing partition walls. (ALM side only) Demolition will be done af | Warwick City | $60,000 |
| Jan 15, 2025 | COMM. | — | Attleboro City | — |
| Jul 31, 2024 | Roof Permit | removal of old roof and installation of new | Cumberland Town | $12,500 |
| Jun 26, 2024 | Building Permit (includes remodels, pools, stoves, tents, signs, storage pod) | new replacement windows, vinyl siding, new kitchen cabinets/countertops, new interior doors, removed existing bathroom tiles and installed new tiles for two bat | Sharon Town | $55,000 |
Permit status
Where its permits stand, as the departments report them.
- Active17
- Completed8
- Issued2
- Cancelled2
- Stop work ordered2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.