Contractor · General building

Joe Dalomba

31 building permits since 2018 in Providence city, RI; Attleboro city, MA and Warwick city, RI, across 6 counties — $3,662,755 in reported job value over 27 permits that state one.

Building permits
31
Reported job value
$3.7M
Active
2018–2026
Latest permit
Oct 18, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI8
  • Attleboro city, MA4
  • Warwick city, RI4
  • Central Falls city, RI3
  • Pawtucket city, RI3
  • Sharon town, MA2
  • Cumberland town, RI2
  • Bristol town, RI1
  • East Greenwich town, RI1
  • Newport city, RI1

Permits by year

By issue date (application date where there is none).

036
6
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20184
20193
20202
20216
20225
20231
20244
20252
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Windows & doors11
  • Remodels10
  • Roofing8
  • Kitchens7
  • Bathrooms6
  • New construction4
  • HVAC2
  • Grading & excavation2
  • Demolition2
  • Pools & hot tubs2

Permit types

As the building departments classify them.

  • Building Permit22
  • Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)2
  • COMM.2
  • RESI.2
  • EG Building Permit1
  • Roofing Permit1
  • Roof Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 18, 2026Building PermitInterior remodeling from a Job Lot into a Church Assembly.Warwick City$800,000
Oct 8, 2026EG Building PermitWORK DESCRIPTION Division 02 Existing Conditions Work is associated with an existing deck that forms an extension of the existing breezeway. Division 05 Metals East Greenwich Town$5,000
Jul 14, 2026Building PermitSteel Structure Erection. New Roof Beam, columns and footings. Main Permit # 26-2219. Interior Renovations.Warwick City$70,000
Feb 4, 2026Building PermitFirst floor only and basement, bathroom remodeling, kitchen remodeling, new windows, new interior doors, ceramic tile on entire first floor.Providence City$80,000
Dec 22, 2025Building PermitSelective demolition including removal of drop ceiling. Removal of carpet, tile and non load bearing partition walls. (ALM side only) Demolition will be done afWarwick City$60,000
Jan 15, 2025COMM.—Attleboro City—
Jul 31, 2024Roof Permitremoval of old roof and installation of newCumberland Town$12,500
Jun 26, 2024Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)new replacement windows, vinyl siding, new kitchen cabinets/countertops, new interior doors, removed existing bathroom tiles and installed new tiles for two batSharon Town$55,000

Permit status

Where its permits stand, as the departments report them.

  • Active17
  • Completed8
  • Issued2
  • Cancelled2
  • Stop work ordered2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.