Contractor · Electrical

EVOLUTION ELECTRIC LLC

31 building permits since 2019 in Buncombe County, NC; Asheville city, NC and Brunswick County, NC, across 3 counties — $427,873 in reported job value over 14 permits that state one.

Building permits
31
Reported job value
$427.9K
Active
2019–2026
Latest permit
May 11, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Buncombe County, NC13
  • Asheville city, NC12
  • Brunswick County, NC4
  • McDowell County, NC1
  • Old Fort town, NC1

Permits by year

By issue date (application date where there is none).

048
7
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20193
20204
20215
20225
20237
20244
20252
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical19
  • Remodels7
  • Bathrooms5
  • Plumbing3
  • Electric meters3
  • Additions2
  • HVAC1
  • Water heaters1

Permit types

As the building departments classify them.

  • Building Permit9
  • Com: Electrical8
  • ELECTRICAL4
  • Electrical2
  • Res: Electrical2
  • Residential Renovation or Remodel2
  • Com: Multi-Trade Heating1
  • Res: Alterations1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 11, 2026Residential Renovation or RemodelGRABOWSKI-finishing basement/family room-no bedroomsBuncombe County$35,000
Oct 16, 2025Res: AlterationsINSTALLING CEILING SUPPORTS TO PREVENT SAGGING. BRINGING ELECTRICAL UP TO CODE AND MOVING ELECTRICAL FIXTURES TO INCLUDE OUTLETS, WIRING AND LIGHT FIXTURES. INSAsheville$30,000
May 5, 2025Com: Multi-Trade HeatingPlumbing: Replace like for like 10 Gallon water heater above locker room, install thermal expansion tank Electrical: Make connections for new water heater. RECDCity Of Asheville—
Oct 30, 2024Com: ElectricalHELENE STORM DAMAGE EXAMINE, REMOVE, AND REPLACE WATER DAMAGED PANEL BOARDS, DISCONNECTS, AND RECEPTACLES.City Of Asheville—
Oct 29, 2024Com: ElectricalHELENE STORM DAMAGE DECONSTRUCT AND REMOVE EXISTING PERIMETER CONDUIT AND GENERAL PURPOSE RECEPTACLES/SWITCHES THAT WERE SUBMERGED BELOW FLOOD WATERS. REMOVE ANCity Of Asheville—
Aug 30, 2024Residential Renovation or RemodelBERENSON/MASTER BATH UPFITBuncombe County$16,250
Feb 8, 2024Residential AdditionLESTER/PATIO-STORAGE RMBuncombe County$35,000
Jul 26, 2023Electrical—Old Fort town—

Permit status

Where its permits stand, as the departments report them.

  • Expired9
  • Finaled8
  • Issued6
  • Active4
  • C/o issued3
  • Documents submitted1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.