Contractor · Electrical

DUKE DOES IT ELECTRIC LLC

31 building permits since 2023 in Citrus County, FL and Crystal River city, FL — $59,950 in reported job value over 11 permits that state one.

Building permits
31
Reported job value
$60K
Active
2023–2026
Latest permit
Sep 8, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Citrus County, FL30
  • Crystal River city, FL1

Permits by year

By issue date (application date where there is none).

07.515
15
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20231
20244
202511
2026 (YTD)15

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical30
  • Electric meters6
  • Gas1
  • HVAC1
  • Roofing1
  • Generators1
  • Heat pumps1
  • EV chargers1
  • New construction1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Electrical28
  • Residential Electrical Express2
  • Amendment1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 8, 2026ElectricalReplace 200 amp Main Breaker Electrical PanelCitrus County—
Aug 21, 2026Electricalwire new detached metal building per nec code including lights outlets and 2 fans ** ACCESSORY STRUCTURE BLD2606-1298 ** NOC FOR ELECTRIC TO METAL BUILDING IN OCitrus County—
Jul 14, 2026Electricalreplace electrical riser due to tornado damage EMERGENCY PERMIT REQUEST / FLOOD ZONE: X - FLOODPLAIN REGULATIONS DO NOT APPLYCitrus County—
Jul 10, 2026Electricalreplace 200 amp meter panel on pole with new 200 amp meter panelCitrus County—
Jun 3, 2026Electricalwire new 200-amp service on detached metal building per nec code BLD2602-1014-ACCESSORY ** NOC N/A ** PRODUCT APPROVAL REQUIRED TO BE ON SITE FOR INSPECTOR ** NCitrus County—
May 20, 2026Residential Electrical Expressreplace existing 200 amp panel for new 200 amp panel. the riser wires are not attached to mast and are causing roof damageCitrus County—
May 7, 2026Electrical20 amp circuit from panel to disconnect to connect owner supplied mini split ** SEPARATE PERMIT REQUIRED FOR MINI SPLIT **Citrus County—
Apr 20, 2026ElectricalWire new 30' x 40' metal building to plans with new 200-amp service / NOC FOR WIRE NEW METAL BUILDING PER PLAN TO CODE IN OR BK:3666/PG:1646 / METAL BUILDING PECitrus County—

Permit status

Where its permits stand, as the departments report them.

  • Closed16
  • Finaled11
  • Pending2
  • Issued1
  • Cancelled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.