Contractor · Electrical

Buddy Michael Cambas

31 building permits since 2022 in Orleans Parish, LA.

Building permits
31
Reported job value
—
Active
2022–2026
Latest permit
Sep 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA31

Permits by year

By issue date (application date where there is none).

01020
20
202220252026*
* 2026 is year to date.
View as table
YearPermits
20221
202520
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical16
  • Generators10
  • Remodels9
  • Electric meters7
  • Gas5
  • HVAC3
  • Plumbing2
  • Kitchens1
  • Additions1
  • Water heaters1

Permit types

As the building departments classify them.

  • Accessory Structure1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 30, 2026—We are correcting backfeeding meters at this location. Apt. 201 is being backfed from Apt. 202. Request outage in order to correctly feed the meter socket for AOrleans Parish—
Jun 10, 2026—Tenant Build Out - Installing new light fixtures, devices, power for HVAC equipment, and 200 Amp 120/208 volt three phase sub panel.Orleans Parish—
May 14, 2026—House meter has a few lights, receptacles, switches, etc for the Whtie Box.Orleans Parish—
May 14, 2026—Performing minor adds to a Church. Installing receptacles, switches, lights, and Power to new HVAC equipment.Orleans Parish—
Apr 15, 2026—Whtie Box Only. Installing receptacles, lights, switches, etc. House Panel will be used for White Box until tenant occupy the three spaces. Upon time they will Orleans Parish—
Apr 7, 2026—Installation of 25KW generator. Plumber already filed on the gas. No other option to file on a new generator.Orleans Parish—
Feb 24, 2026—Adding sub panel and installing power for new AC equipment. Adding some track lights.Orleans Parish—
Feb 5, 2026—Applying for Temporary Construction Pole.Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Finaled20
  • Issued9
  • Not stated1
  • Duplicate1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.