Contractor · Electrical

SUNGRID SOLAR

32 building permits since 2021 in Los Angeles city, CA; San Diego County, CA and Burbank city, CA, across 3 counties.

Building permits
32
Reported job value
—
Active
2021–2026
Latest permit
Feb 11, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA20
  • San Diego County, CA9
  • Burbank city, CA1
  • Moreno Valley city, CA1
  • Oceanside city, CA1

Permits by year

By issue date (application date where there is none).

07.515
15
2021202220232026*
* 2026 is year to date.
View as table
YearPermits
20213
202215
202313
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical25
  • Solar11
  • Battery storage3
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical22
  • BLD SOLAR PV RES1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 11, 2026ElectricalNew 6.48kw solar installation with 16 modules roof mounted and tesla powerwall 3 energy storage with integrated inverters and tesla meter color adapter.Moreno Valley City—
Dec 8, 2023ElectricalSolar Panels - 18 panels with 7.2 kW.Burbank City—
Sep 20, 2023—ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT) *The scope San Diego County—
May 17, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
May 5, 2023—ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD WITH EXISTING RESIDENTIAL MAIN ELECTRICAL SERVICE UPGRADE - 200A - (ONLINE PERMIT) *The scope of work is limiteSan Diego County—
May 3, 2023Electrical—Los Angeles City—
Mar 28, 2023Electrical—Los Angeles City—
Mar 13, 2023Electrical—Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated20
  • Issued6
  • Active3
  • Finaled3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

SUNGRID SOLAR — Building Permits & Contractor Profile | Buildstats