Contractor · Plumbing

A Johnson Plumbing Inc

376 building permits since 2002 in Minneapolis city, MN; Coon Rapids city, MN and Blaine city, MN, across 2 counties — $41,040 in reported job value over 8 permits that state one.

Building permits
376
Reported job value
$41K
Active
2002–2026
Latest permit
Oct 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN316
  • Coon Rapids city, MN31
  • Blaine city, MN21
  • Lino Lakes city, MN4
  • Ramsey city, MN3
  • Columbia Heights city, MN1

Permits by year

By issue date (application date where there is none).

02550
46
20022005201120142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20023
200313
20044
20055
20061
20091
20112
20122
20134
20142
20152
20165
201746
201821
201942
202032
202138
202233
202334
202428
202533
2026 (YTD)25

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing367
  • Bathrooms208
  • Kitchens110
  • Remodels77
  • Gas71
  • Water heaters21
  • Additions8
  • HVAC7
  • New construction5
  • Demolition4

Permit types

As the building departments classify them.

  • Plumbing347
  • BLDG - Residential13
  • PLUMBING5
  • BLDG - Commercial3
  • Commercial1
  • ePermit - Residential Plumbing Remodel/Addition1
  • Mechanical1
  • Residential1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 28, 2026PlumbingBasement remodel. Install DWV, water lines & fixtures for water closet, shower, lavatory sink, laundry sink, washer box & floor drainMinneapolis City—
Oct 28, 2026PlumbingUpstairs bath remodel. Upsize old drain to 2" for shower if possible. move toilet a few inches, install fixtures Additional shower faucet installation on main fMinneapolis City—
Oct 28, 2026PlumbingInstall new drain, waste, venting, water lines & fixtures for kitchen sink, faucet & dishwasherMinneapolis City—
Oct 23, 2026PlumbingHome remodel. Remodel upstairs bath & main floor bath. Basement bath is completely new, Install DWV, water lines & fixtures. Install DWV, water lines & fixturesMinneapolis City—
Oct 8, 2026PlumbingInstall new DWV, water lines & fixture for kitchen sink, dishwasher & refridgeMinneapolis City—
Sep 30, 2026PlumbingInstall new kitchen sink, faucet, reinstall existing dishwasher. Finish only in kitchen. Connect gas to range. Replumb laundry sink properly.Minneapolis City—
Sep 21, 2026PlumbingInstall new drain, waste, venting, water lines & fixtures for kitchen sink & dishwasherMinneapolis City—
Sep 21, 2026PlumbingInstall new DWV, water lines & fixtures for water closet, double lavatory sinks & tubMinneapolis City—

Permit status

Where its permits stand, as the departments report them.

  • Closed299
  • Finaled41
  • Issued16
  • Expired12
  • Not stated5
  • Cancelled2
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.