Contractor · General building

PICEMINI CONSTRUCTION

32 building permits since 2015 in Killeen city, TX; Temple city, TX and Copperas Cove city, TX, across 2 counties — $89,306 in reported job value over 21 permits that state one.

Building permits
32
Reported job value
$89.3K
Active
2015–2026
Latest permit
Apr 6, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Killeen city, TX22
  • Temple city, TX9
  • Copperas Cove city, TX1

Permits by year

By issue date (application date where there is none).

048
8
20162018202020222026*
* 2026 is year to date.
View as table
YearPermits
20151
20165
20174
20181
20192
20208
20213
20225
20232
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels3
  • Additions2
  • Windows & doors2
  • Plumbing1
  • Demolition1
  • Electrical1

Permit types

As the building departments classify them.

  • CONCRETE / ASPHALT PAVING16
  • FENCE2
  • REMODEL SINGLE FAMILY WINDOWS/DOORS/SIDING2
  • ACCESSORY BUILDING1
  • ADDITION SINGLE FAMILY1
  • Commercial - Addition or Remodel1
  • Flatwork1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 6, 2026FlatworkWe will mark out an area in the back yard that is a minimum of 5 feet away from the side property lines, a minimum of 10 feet from the main dwelling and 10 feetTemple City—
May 2, 2023—25x25 driveway extension, no coverTemple City—
Mar 31, 2023Commercial - Addition or RemodelINSTALL 685' CONCRETECopperas Cove City—
Nov 28, 2022—Concrete patio with sidewalk around the house, see site planTemple City—
Nov 15, 2022—7-11- demo and replace 90x1 ft in the parking lot and 8x15 for new ramp.Temple City—
Aug 19, 2022—4X26 PATIO EXTENSION-NO STRUCTURETemple City—
Aug 8, 2022—2x3 patio extension with overhang structure (to be permitted at a later time)Temple City—
Aug 1, 2022—7.5 and 7ft driveway extensionTemple City—

Permit status

Where its permits stand, as the departments report them.

  • Issued21
  • Finaled5
  • Expired3
  • Not stated1
  • Withdrawn1
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.