Contractor · General building
NEW SPACES
32 building permits since 1998 in Minneapolis city, MN; Blaine city, MN and Coon Rapids city, MN, across 2 counties — $1,162,228 in reported job value over 30 permits that state one.
- Building permits
- 32
- Reported job value
- $1.2M
- Active
- 1998–2026
- Latest permit
- Jan 2, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN29
- Blaine city, MN2
- Coon Rapids city, MN1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 1998 | 1 |
| 1999 | 1 |
| 2018 | 2 |
| 2019 | 2 |
| 2020 | 3 |
| 2021 | 6 |
| 2022 | 4 |
| 2023 | 7 |
| 2024 | 1 |
| 2025 | 4 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels29
- Plumbing15
- Electrical15
- HVAC14
- Kitchens14
- Bathrooms13
- Windows & doors7
- Additions4
- Demolition4
- Roofing3
Permit types
As the building departments classify them.
- Res26
- Commercial3
- BLDG - Residential1
- Building1
- BUILDING1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 2, 2026 | Res | (DMH-Pdox) KITCHEN REMODEL IN SFD. MINOR WALL DEMO AND NEW PARTITION FRAMING. 1 NEW WINDOW OPENING. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS | Minneapolis City | $26,400 |
| Dec 23, 2025 | Res | (DMH-Pdox) REMODEL KITCHEN IN SFD. DEMO WALL BETWEEN KITCHEN AND DINING ROOM AND FRAME NEW WALL LOCATION. NEW FRAMING FOR NEW POWDER ROOM AND ENTRY ALCOVE AT FR | Minneapolis City | $76,350 |
| Feb 25, 2025 | Res | MAIN FLOOR REMODEL OF EXISTING LIBRARY ROOM IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS AND DOCUMENT). - REMODEL EXISTING LIBRARY TO INSTALL NEW CAB | Minneapolis City | $3,536 |
| Jan 20, 2025 | Res | 2ND FLOOR PRIMARY SUITE AND HALLWAY BATHROOM REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS) DEMOLITION WORK: - GUT EXISTING HALLWAY BATHROOM T | Minneapolis City | $75,996 |
| Jan 9, 2025 | Res | PARTIAL 2ND FLOOR INTERIOR DEMOLITION OF ONE EXISTING BEDROOM AND HALLWAY BATHROOM OF A SINGLE FAMILY HOUSE. AAJ (PROJECVT DOX PLAN) - REMOVE EXISTING INTERIOR | Minneapolis City | $2,000 |
| Jun 6, 2024 | Res | (DMH-ProjectDox) CONSTRUCT REAR DORMER ADDITION TO SFD AND FINISH UPPER LEVEL FOR NEW BEDROOM AND BATHROOM. INSTALL NEW (3)20" LVL RIDGE BEAM AND SPRAY FOAM INS | Minneapolis City | $80,275 |
| Aug 7, 2023 | Res | REMODEL FINISH BASEMENT Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND | Minneapolis City | $24,307 |
| Jul 27, 2023 | Commercial | Unit 615 bathroom remodel including new shower drain rough in The building inspector must approve the restoration of fire and acoustical assemblies disrupted by | Minneapolis City | $33,800 |
Permit status
Where its permits stand, as the departments report them.
- Closed21
- Expired5
- Cancelled2
- Active1
- Issued1
- Finaled1
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.