Contractor · Specialty (solar, fire, telecom)

MIKE JOHNSTON

32 building permits since 2017 in Buffalo city, NY — $594,000 in reported job value over 32 permits that state one.

Building permits
32
Reported job value
$594K
Active
2017–2026
Latest permit
Jun 17, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Buffalo city, NY32

Permits by year

By issue date (application date where there is none).

01020
17
2017202120232026*
* 2026 is year to date.
View as table
YearPermits
20171
20203
20211
202217
20238
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Telecom32
  • Electrical5
  • Roofing1

Permit types

As the building departments classify them.

  • TOWERSATT31
  • REP-PLANS1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 17, 2026TOWERSATTModifications to an existing telecom facility. Scope of work: changing components of an existing system. CHECK SHEET S-1 FOR REPAIRS TO MOUNT.<div><br></div><diBuffalo City$15,000
Jun 27, 2025REP-PLANSUpgrade (1) of the existing antennas and ancillary equipment. There will be no ground disturbance or change in tower height. Structural Analysis and engineer apBuffalo City$18,000
Jun 8, 2023TOWERSATTREPLACING (1) EXISTING ANTENNA ON THE ROOF OF EXISTING UNMANNED WIRELESS SITE WITH (1) NEW MODEL ANTENNA OF SAME SIZE FOR " VERIZON ".&nbsp; &nbsp;&nbsp;<div><bBuffalo City$10,000
Apr 20, 2023TOWERSATTTO AN EXISTING MASONRY PARKING RAMP STRUCTURE REMOVE AND REPLACE ANTENNA'S AND RRH UNITS.SEE PLANS FOR LOCATION.<div><br></div><div>***PLANS FILED THROUGH IDT**Buffalo City$20,000
Apr 17, 2023TOWERSATTTO AN EXISTING UTILITY POLE IN FRONT OF 823 BUSTI, REMOVE 3 EXISTING ANTENNA'S AND REPLACE WITH NEWER MODELS. ALSO REMOVE 2 COAX CABLES AND REPLACE WITH 16 COAXBuffalo City$2,500
Mar 17, 2023TOWERSATTReplace (1) radio and install (1) combiner for "Verizon" at an existing wireless facility. Ground equipment only.&nbsp;<div><br></div><div>*** PLANS FILED THROUBuffalo City$15,000
Mar 2, 2023TOWERSATT( NORTH PARK ACADEMY )&nbsp; EQUIPMENT UPGRADES TO EXISTING WIRELESS COMMUNICATION SITE FOR " VERIZON " -&nbsp; REMOVE (1) EXISTING RRH UNIT, (2) EXISTING COAX Buffalo City$2,000
Mar 1, 2023TOWERSATTUPGRADES TO EXISTING " VERIZON " WIRELESS SITE - #1.&nbsp; REMOVE (1) ANTENNA (ROOF), (1) EXISTING RRH UNIT FROM EXISTING GROUND LEVEL EQUIPMENT AREA, (2) COAX Buffalo City$1,500

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.