Contractor · General building
Michael Buturla
32 building permits since 2013 in East Baton Rouge Parish, LA — $38,673,974 in reported job value over 29 permits that state one.
- Building permits
- 32
- Reported job value
- $38.7M
- Active
- 2013–2026
- Latest permit
- Aug 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- East Baton Rouge Parish, LA32
Permits by year
By issue date (application date where there is none).
048
8
20182020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 1 |
| 2018 | 2 |
| 2019 | 7 |
| 2020 | 1 |
| 2021 | 2 |
| 2022 | 5 |
| 2023 | 2 |
| 2024 | 2 |
| 2025 | 2 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels23
- New construction9
- Grading & excavation6
- Roofing5
- Kitchens4
- Additions4
- Bathrooms4
- Fire sprinklers3
- Solar2
- Gas1
Permit types
As the building departments classify them.
- Existing Bldg - Remodel Only (C)17
- New Building Permit (C)8
- Existing Bldg - Addition & Remodel (Both) (C)2
- Re-Roof (C)2
- Existing Bldg - Addition Only (R)1
- Interior Shell Buildout (C)1
- Occupancy Permit (C)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 4, 2026 | New Building Permit (C) | The New Arts Building at the McKinley High School will be used as new classroom space for the arts curriculum 13,334 sf Sprinkler & Fire Alarm. | East Baton Rouge Parish | $6,264,155 |
| Jun 25, 2026 | Existing Bldg - Remodel Only (C) | This renovation is in Building F on McKinley High School Campus. Building F is the classroom for the automotive shop class. There is a classroom and open space | East Baton Rouge Parish | $947,512 |
| Jun 3, 2026 | Re-Roof (C) | Building H at McKinley High School is the receive a new roof. There is no interior renovation work at Building H. There is site work for entire school and those | East Baton Rouge Parish | — |
| May 19, 2026 | Existing Bldg - Remodel Only (C) | McKinley High School Campus- Building E renovation of band Room and JROTC Classroom building. | East Baton Rouge Parish | $1,920,456 |
| Apr 23, 2026 | Existing Bldg - Addition & Remodel (Both) (C) | Building B on McKinley High School campus is an existing classrooms building. The addition to the building is an elevator. | East Baton Rouge Parish | $4,344,215 |
| Apr 23, 2026 | Existing Bldg - Addition & Remodel (Both) (C) | Building A at McKinley High School Campus is the administration building. BLDG. A also includes the theater, gymnasium and locker rooms. Only the admin area, lo | East Baton Rouge Parish | $6,727,034 |
| Apr 23, 2026 | Existing Bldg - Remodel Only (C) | McKinley High School Campus Remodel of Building C a 2 story classroom building with a Library space. | East Baton Rouge Parish | $3,535,690 |
| Mar 18, 2026 | Re-Roof (C) | McKinley High School - Reroof of Buildings G (and Building H -will have a separate permit). The entire campus is being renovated and all other buildings are bei | East Baton Rouge Parish | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.