Contractor · Electrical
Mario Pereira
380 building permits since 2009 in Brewster town, MA; Boston city, MA and Falmouth town, MA, across 14 counties — $12,573,398 in reported job value over 290 permits that state one.
- Building permits
- 380
- Reported job value
- $12.6M
- Active
- 2009–2026
- Latest permit
- Oct 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Brewster town, MA59
- Boston city, MA52
- Falmouth town, MA27
- Quincy city, MA25
- Easton town, MA15
- Dedham town, MA15
- Middleborough town, MA15
- Wareham town, MA14
- North Attleborough Town city, MA13
- Canton town, MA9
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2009 | 3 |
| 2010 | 5 |
| 2011 | 1 |
| 2013 | 3 |
| 2014 | 3 |
| 2015 | 4 |
| 2016 | 17 |
| 2017 | 18 |
| 2018 | 23 |
| 2019 | 26 |
| 2020 | 14 |
| 2021 | 32 |
| 2022 | 24 |
| 2023 | 24 |
| 2024 | 59 |
| 2025 | 41 |
| 2026 (YTD) | 83 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical325
- New construction64
- Remodels57
- Bathrooms17
- HVAC14
- Additions11
- Kitchens9
- Electric meters9
- Demolition8
- Generators5
Permit types
As the building departments classify them.
- Electrical Permit133
- ELECT.74
- Wiring Permit58
- ELECTRICAL30
- FA16
- FIREALARM9
- Building Permit7
- ELECT6
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2026 | Electrical Permit | — | Barnstable Town City | $205,000 |
| Oct 29, 2026 | Fire Alarm Permit | Moving two existing smoke detectors, one existing horn/strobe device and one existing strobe device in a former Starbucks that is being fit-out to become a Blan | Providence City | $5,000 |
| Oct 28, 2026 | Electrical Permit | Fitting out an existing space that is being turned into a SOLIDCORE gym. This fit-out includes new lighting, controls, power and using the existing panel by add | Wellesley Town | $76,900 |
| Oct 6, 2026 | Electrical Permit | Interior fit-out and renovation of an existing former Starbucks for conversion into a Blank Street Coffee location. Electrical work includes the demolition and | Providence City | $120,800 |
| Sep 21, 2026 | ELECT | 3 new outlets and device swap | Bellingham Town | $150 |
| Sep 16, 2026 | Electrical Permit | This project includes the demo/make safe of the existing circuits that feed the existing lighting fixtures that are being replaced, as well other mechanical/ref | Everett City | $86,900 |
| Sep 4, 2026 | Electrical Permit | Replace existing fire alarm control panel, annunicators, install new notification devices and power supplies throughout the store | Warwick City | $28,000 |
| Sep 2, 2026 | LVOLT | LVOLT | Boston City | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed160
- Active110
- Closed70
- Issued32
- Finaled3
- Stop work ordered3
- Approved2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.