Contractor · General building
INSPIRED SPACES LLC
32 building permits since 2017 in Minneapolis city, MN — $1,300,325 in reported job value over 32 permits that state one.
- Building permits
- 32
- Reported job value
- $1.3M
- Active
- 2017–2026
- Latest permit
- Aug 12, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN32
Permits by year
By issue date (application date where there is none).
036
6
20182020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2018 | 6 |
| 2019 | 1 |
| 2020 | 4 |
| 2021 | 5 |
| 2022 | 3 |
| 2023 | 2 |
| 2024 | 6 |
| 2025 | 1 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels20
- HVAC17
- Bathrooms17
- Plumbing15
- Electrical15
- Windows & doors11
- Kitchens6
- Additions2
- Roofing1
- Demolition1
Permit types
As the building departments classify them.
- Res30
- Commercial2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 12, 2026 | Res | (DMH-Pdox) BATHROOM REMODEL IN SFD. REPLACE FIXTURES IN SAME LOCATIONS. REPLACE WINDOW WITH GLASS BLOCK. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS AT BAT | Minneapolis City | $49,005 |
| Apr 9, 2026 | Res | (DMH-Pdox) INSTALL BASEMENT EGRESS WINDOW TO REAR YARD OF SFD. - 2020 MNSBC FINISH BASEMENT WITH NEW 3/4 BATH, OFFICE, MECHANICAL AND STORAGE. THIS PERMIT DOES | Minneapolis City | $121,800 |
| Feb 3, 2026 | Res | KITCHEN REMODEL AND ADD BATHROOM (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL | Minneapolis City | $104,000 |
| May 27, 2025 | Res | bathroom remodel. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATI | Minneapolis City | $45,850 |
| Dec 17, 2024 | Res | KITCHEN REMODEL (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND H | Minneapolis City | $54,640 |
| Oct 3, 2024 | Res | Replace front door into existing rough opening, no structural change. | Minneapolis City | $3,000 |
| Aug 20, 2024 | Res | INSTALL PITCHED ROOF Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HE | Minneapolis City | $66,050 |
| Jun 6, 2024 | Res | Convert bedroom into master bathroom Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, | Minneapolis City | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Closed25
- Issued4
- Active2
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.