Contractor · Specialty (solar, fire, telecom)

David Picazio

381 building permits since 2012 in Needham town, MA; Quincy city, MA and Natick town, MA, across 9 counties — $12,010,353 in reported job value over 352 permits that state one.

Building permits
381
Reported job value
$12M
Active
2012–2023
Latest permit
Sep 19, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Needham town, MA41
  • Quincy city, MA26
  • Natick town, MA25
  • Canton town, MA21
  • Somerville city, MA18
  • North Andover town, MA17
  • Sharon town, MA13
  • Abington town, MA13
  • Grafton town, MA13
  • Methuen city, MA10

Permits by year

By issue date (application date where there is none).

0100200
185
20122016201820202023
View as table
YearPermits
20121
20141
20165
20176
20183
20196
20203
2022185
2023171

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar283
  • Electrical163
  • Battery storage47
  • Remodels21
  • Electric meters21
  • Pools & hot tubs6
  • Roofing4
  • Additions3
  • EV chargers2
  • Windows & doors1

Permit types

As the building departments classify them.

  • Electrical Permit92
  • Building Permit53
  • Building Permit - Application25
  • Electrical Permit - Residential & Commercial Projects21
  • Building Permit Application20
  • RESI.14
  • Building Permit - Residential (Single, 2-Family or Townhouses) Projects10
  • Solar Permit - Residential (Single, 2-Family or Townhouses) Projects10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 19, 2023Building Permit ApplicationInstall 7.695kW DC (19 panels) rooftop solar array.Quincy City$41,000
Aug 30, 2023Building Permit—Southborough Town—
Aug 10, 2023Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)Install 12.15kW DC (30 panels) rooftop solar array. NO STORAGE BATTERY NO STRUCTUAL UPGRADES NECESSARY Snow guards are required over the egress points to the stSharon Town$15,984
Aug 10, 2023Building Permit - Short FormInstall 18.63kW DC (46 panels) rooftop solar array.Bolton Town$22,121
Aug 10, 2023Electrical PermitSolar PanelsBolton Town$44,242
Jul 31, 2023Building Permit - ResidentialInstall 4.35kW DC (10 panels) rooftop solar array in addition to existing system already on site.Winthrop Town City$18,572
Jul 18, 2023Building PermittrueWareham Town$8,950
Jul 5, 2023Building Permit (includes remodels, pools, stoves, tents, signs, storage pod)Install 31.39kW DC (81 panels) rooftop solar array. NO BATTERY STORAGE SYSTEMS ALLOWED. NO STRUCTUAL UPGRADES NEEDED.Sharon Town$88,244

Permit status

Where its permits stand, as the departments report them.

  • Completed282
  • Active56
  • Closed15
  • Issued12
  • Stop work ordered7
  • Not stated6
  • Finaled2
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.