Contractor · Specialty (solar, fire, telecom)
CALIFORNIA SOLAR INTEGRATORS INC
381 building permits since 2017 in Los Angeles city, CA; Sacramento city, CA and San Jose city, CA, across 11 counties — $49,239,435 in reported job value over 147 permits that state one.
- Building permits
- 381
- Reported job value
- $49.2M
- Active
- 2017–2026
- Latest permit
- Oct 22, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA278
- Sacramento city, CA29
- San Jose city, CA11
- Vista city, CA9
- San Diego County, CA8
- Oceanside city, CA8
- Davis city, CA7
- Merced city, CA7
- Sacramento County, CA6
- Madera city, CA5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 14 |
| 2018 | 12 |
| 2019 | 50 |
| 2020 | 75 |
| 2021 | 94 |
| 2022 | 65 |
| 2023 | 25 |
| 2024 | 28 |
| 2025 | 9 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar263
- Electrical108
- Plumbing99
- HVAC47
- Roofing43
- Water heaters33
- Remodels11
- Additions10
- New construction6
- Windows & doors4
Permit types
As the building departments classify them.
- Electrical99
- Bldg-Alter/Repair84
- Plumbing61
- Pressure Vessel33
- Apts 5+14
- Apts 3-412
- Apartment10
- BLD SOLAR PV COMM8
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 22, 2026 | Electrical Permit | Building #3-96 Phono Solar TEchnology Co 590W 1- Solaredge inverter SE50KUS 96-SE C651U Optimizer 56.64KWDC 50KWAC | Scotts Valley City | $217,784 |
| Aug 17, 2026 | Electrical Permit | Building #2- 4153 Phono Solar Technology 1- Solaredge Inverter SE50KUS 1-Solaredge Inverter SE17.3KUS 153 SE Optimizer 90.27kW DC - 67.3 KWAC | Scotts Valley City | $217,783 |
| Jun 25, 2026 | Electrical Permit | Building #1- 181 Phono Solar technology 590W - 2 Solaredge Inverter - 181 SE Optimizer. System Rating: 106.79 -100 KWAC | Scotts Valley City | $653,351 |
| Apr 27, 2026 | BLDG - Building (C) | Online. Master Solar for Rendezvous Apartments 512 panels 302.080 kW **Plan check hourly | Temecula City | — |
| Jan 28, 2026 | BLD SOLAR PV COMM | 80 KW COMMERCIAL ROOFTOP PV, 135 MODULES, | Oceanside City | — |
| Jan 28, 2026 | BLD SOLAR PV COMM | 254 KW COMMERCIAL SOLAR ROOFTOP AND CARPORTS, 434 MODULES, | Oceanside City | — |
| Jan 28, 2026 | BLD SOLAR PV COMM | 384.35 COMMERCIAL ROOFTOP AND CARPORT, 657 MODULES, | Oceanside City | — |
| Jan 28, 2026 | BLD SOLAR PV COMM | 265.6 KW COMMERCIAL SOLAR ROOFTOP AND CARPORT, 454 MODULES, | Oceanside City | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated195
- Issued87
- Finaled65
- Expired14
- Completed10
- Active7
- C/o issued2
- Reviews in progress1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- CALIFORNIA SOLAR INTEGRATORS
- CALIFORNIA SOLAR INTERGRATORS INC
- CALIFORNIA SOLAR INTEGRATOS INC
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.