32 building permits since 2020 in Stamford town, CT; Glastonbury town, CT and South Windsor town, CT, across 6 counties — $2,680,678 in reported job value over 29 permits that state one.
- Building permits
- 32
- Reported job value
- $2.7M
- Active
- 2020–2026
- Latest permit
- Mar 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT13
- Glastonbury town, CT6
- South Windsor town, CT6
- Winchester town, CT2
- Lebanon town, CT2
- Bristol town, CT1
- Hamden town, CT1
- Redding town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 3 |
| 2022 | 4 |
| 2023 | 5 |
| 2024 | 6 |
| 2025 | 11 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar32
- Electrical22
- Electric meters19
- HVAC1
- Roofing1
Permit types
As the building departments classify them.
- Electrical Permit9
- Building Permit8
- Electrical Permit General5
- Photovoltaic Solar Electrical Permit5
- Building Permit (No Trades)2
- A Residential Building Application & One and Two Family Dwelling Only (for apt's or condo use Commercial Bldg)1
- *SOLAR1
- Solar PV1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 4, 2026 | Building Permit | Install 134.8kw Roof mounted pv solar array. AC disconnect next to utility meter. Buy all incentive connected to exiting utility transformer. | Stamford Town | $249,500 |
| Mar 4, 2026 | Building Permit | Roof mounted pv solar array 299kw DC. AC disconnect next to utility meter. Buy all incentive tied to existing utility transformer. Safety labels, roof setbacks | Stamford Town | $552,947 |
| Jan 12, 2026 | Electrical Permit | Roof mounted 299kw DC solar array. Buy all incentive tied to existing utility transformer. AC disconnect next to utility meter. Safety labels, access and roof e | Stamford Town | $500,000 |
| Nov 10, 2025 | Electrical Permit | Install 128KW DC grid connected solar array. AC disconnect next to utility meter. Safety labels and signs, access and setbacks as per Building Code 2022 and NEC | Stamford Town | $200,000 |
| Nov 9, 2025 | Building Permit | 8.1kw DC solar with 20 panels, enphase micor inverters for rapid shutdown. AC disconnect next to utility meter. Safety labels as per Building Code 2022 and NEC | Lebanon Town | $29,160 |
| Nov 9, 2025 | Electrical Permit | 20 ground mount solar array 8.1kw dc. AC disconnect next to utility meter. Safety labels as per Building Code 2022 and NEC 690. Rapid shitdown w enphaser micro | Lebanon Town | — |
| Nov 4, 2025 | Building Permit | Roof mounted 5.7kw dc array with 14 solar panels. AC disconnect next to utility meter. Rapid shutdown with enphase micro inverters. | Stamford Town | $19,100 |
| Nov 4, 2025 | Electrical Permit | roof mounted pv solar with 14 panels, 5.6kw dc array. Rapid shutdown w enphase micro inverters. Safety labels and access/clearance as per Building code 2022 and | Stamford Town | $15,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed24
- Active8
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.