Contractor · Plumbing
Brian Jones
32 building permits since 2021 in Enfield town, CT; Bristol town, CT and South Windsor town, CT, across 3 counties — $234,534 in reported job value over 32 permits that state one.
- Building permits
- 32
- Reported job value
- $234.5K
- Active
- 2021–2026
- Latest permit
- Oct 22, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Enfield town, CT22
- Bristol town, CT4
- South Windsor town, CT3
- Glastonbury town, CT1
- Rocky Hill town, CT1
- Winchester town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 1 |
| 2022 | 5 |
| 2023 | 7 |
| 2024 | 3 |
| 2025 | 7 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing31
- Gas8
- Bathrooms6
- Kitchens5
- HVAC4
- Remodels3
- Generators3
- Demolition3
- Electrical3
- Water heaters3
Permit types
As the building departments classify them.
- Plumbing Permit27
- Mechanical Permit3
- Building Permit (No Trades)1
- HVAC/Mechanical Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 22, 2026 | Plumbing Permit | EMERGENCY-We cut out supply and outlet and disconnected gas line before taking water heater out of basement. We brought new 50 gallon gas water heater down and | Enfield Town | $3,763 |
| Oct 2, 2026 | Plumbing Permit | Emergency- Replace water heater with 50 gallon electric water heater. We drained down and put new water heater in and installed new 1/2in ball valve. | Enfield Town | $2,596 |
| Sep 15, 2026 | Mechanical Permit | EMERGENCY Install a new Navien NCB-240/110H combination boiler and domestic water heater. The new unit will be wall-mounted in the basement and installed in acc | Enfield Town | $17,105 |
| Aug 6, 2026 | Plumbing Permit | Excavate and repair approx 40 feet of Copper K water line from the curb stop to the water main valve inside. | Enfield Town | $8,853 |
| Jul 9, 2026 | Plumbing Permit | Bathroom Rough in. All drainage piping to be installed in PVC (schedule 40) unless otherwise specified. Proper pitch will be maintained on all horizontal draina | Enfield Town | $8,958 |
| Jul 1, 2026 | Mechanical Permit | Remove and dispose of existing mini split system Installation of a new 3 Ton mini split condenser Installation of (4) indoor wall-mounted heads: (1) 12K BTU bla | Enfield Town | $18,963 |
| May 6, 2026 | Plumbing Permit | Scope includes installing the meter on the sprinkler feed piping so sprinkler water usage can be properly measured separately from domestic water usage. | Enfield Town | $1,445 |
| Apr 28, 2026 | Plumbing Permit | New kitchenette and piping hookups for laundry area | South Windsor Town | $7,400 |
Permit status
Where its permits stand, as the departments report them.
- Completed20
- Active12
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.