Contractor · HVAC
alan hagopian/arh hvac alan hagopian/arh hvac
32 building permits since 2010 in Foxborough town, MA — $234,380 in reported job value over 28 permits that state one.
- Building permits
- 32
- Reported job value
- $234.4K
- Active
- 2010–2018
- Latest permit
- Jan 16, 2018
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Foxborough town, MA32
Permits by year
By issue date (application date where there is none).
07.515
11
20102012201420162018
View as tableHide table
| Year | Permits |
|---|---|
| 2010 | 1 |
| 2011 | 1 |
| 2012 | 7 |
| 2013 | 11 |
| 2014 | 2 |
| 2015 | 1 |
| 2016 | 3 |
| 2017 | 5 |
| 2018 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC31
- Gas15
- New construction12
- Kitchens7
- Bathrooms4
- Roofing1
- Heat pumps1
Permit types
As the building departments classify them.
- RESI.32
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 16, 2018 | RESI. | Bldg Alt/SheetMetal - Installation of one Dakin ducted mini split system. Final inspection required.Legacy Status: SIGNED OFF | Foxborough Town | $6,800 |
| Dec 5, 2017 | RESI. | New Const/SheetMetal - Install two gas furnaces and A/C systems and complete duct work, vent in all bath fans and kitchen hood and install make up air system. R | Foxborough Town | $29,500 |
| Sep 18, 2017 | RESI. | New Const/Mechanical - Installation of (2) forced air HVAC systems. Final inspection required.Legacy Status: SIGNED OFF | Foxborough Town | $28,000 |
| Sep 18, 2017 | RESI. | New Const/SheetMetal - Install ductwork for (2) forced air HVAC systems, vent kitchen hood and all bath fans. Final inspection required.Legacy Status: SIGNED OF | Foxborough Town | — |
| Jan 4, 2017 | RESI. | BldgAlt/Mechanical - Installation of (1) range hood. Final inspection required.Legacy Status: OPEN | Foxborough Town | $200 |
| Jan 4, 2017 | RESI. | Bldg Alt/SheetMetal - Vent (1) stainless steel exhaust hood. Final inspection required.Legacy Status: OPEN | Foxborough Town | — |
| Oct 26, 2016 | RESI. | New Const/SheetMetal - Install two gas furnaces with central air with associated ductwork and vent al bath fans. Rough and final inspections required.Legacy Sta | Foxborough Town | $13,500 |
| Jun 23, 2016 | RESI. | Bldg Alt/SheetMetal - Install kitchen exhaust vent and make up air system. Final inspection required.Legacy Status: OPEN | Foxborough Town | $800 |
Permit status
Where its permits stand, as the departments report them.
- Issued27
- Completed3
- Closed2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.