Contractor · Electrical
Sunrun Installation Services Inc
33 building permits since 2021 in Mesa city, AZ and Peoria city, AZ — $320,898 in reported job value over 29 permits that state one.
- Building permits
- 33
- Reported job value
- $320.9K
- Active
- 2021–2023
- Latest permit
- Jul 28, 2023
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ30
- Peoria city, AZ3
Permits by year
By issue date (application date where there is none).
01020
20
202120222023
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 2 |
| 2022 | 20 |
| 2023 | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical30
- Solar19
- Battery storage12
- Electric meters4
- EV chargers1
Permit types
As the building departments classify them.
- Electrical30
- Residential3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 28, 2023 | Electrical | THIS PERMIT IS ONLY FOR THE INSTALLATION OF A TESLA POWER WALL BATTERY AND TESLA POWERWALL BACKUP GATEWAY 2 . ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPEC | Mesa | $9,400 |
| Jul 10, 2023 | Electrical | THIS PERMIT IS FOR A NEW 200A ELECTRIC SERVICE PANEL UPGRADE WITH A 225A MAX. BUS RATING. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. PERMIT D | Mesa | $14,798 |
| Jun 29, 2023 | Electrical | INSTALLATION OF A 100 AMP CIRCUIT BREAKER FOR A WALL CONNECTOR VEHICLE CHARGER IN GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANU | Mesa | — |
| Jun 28, 2023 | Electrical | THIS PERMIT IS TO UPGRADE TO A 200A. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNEC | Mesa | $2,500 |
| Apr 24, 2023 | Electrical | THIS PERMIT IS TO UPGRADE TO A 225A SERVICE PANEL WITH A 200A MAIN BREAKER. ALL WORK TO BE PERFORMED PER IRC 2018 AND SRP SPECIFICATIONS. DO NOT DISCONNECT UTIL | Mesa | $17,918 |
| Apr 10, 2023 | Electrical | THIS PERMIT IS ONLY FOR THE INSTALLATION OF TWO (2) TESLA POWER WALL ENERGY STORAGE SYTEMS AND BACKUP GATEWAY SYSTEM. ALL WORK TO BE PERFORMED PER IRC 2018 AND | Mesa | $28,382 |
| Nov 30, 2022 | Electrical | MPU 200A TO 225A. PV AND MPU INSTALLATION | Mesa | $16,780 |
| Nov 30, 2022 | Electrical | MPU - 100AMP TO 225AMP. PV AND MPU INSTALL | Mesa | $14,048 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued28
- Issued3
- Paid1
- Pending payment1
Also on file as
The same name elsewhere
- SUNRUN INSTALLATION SERVICES INCLos Angeles city, CA27K
- Sunrun Installation Services Inc.Las Vegas city, NV8.6K
- SUNRUN INSTALLATION SERVICESElgin city, IL5.2K
- SUNRUN INSTALLATION SERVICES INCHoward County, MD2.3K
- SUNRUN INSTALLATION SERVICES INCBoulder city, CO1.1K
- Sunrun Installation ServicesWilliamson County, TX619
- SUNRUN INSTALLATION SERVICES INCTemple Terrace city, FL502
- SUNRUN INSTALLATION SERVICES INCDorchester County, SC164
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.