Contractor · Electrical

NB TRADING INC dba EXCEL ELECTRIC

33 building permits since 2017 in Boulder city, CO — $115,971 in reported job value over 21 permits that state one.

Building permits
33
Reported job value
$116K
Active
2017–2026
Latest permit
Mar 19, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO33

Permits by year

By issue date (application date where there is none).

048
7
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20171
20186
20194
20202
20214
20221
20231
20244
20257
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical33
  • Electric meters8
  • Bathrooms4
  • Kitchens3
  • Remodels3
  • Demolition3
  • Gas1
  • HVAC1
  • Plumbing1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical Permit32
  • Sign Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 19, 2026Electrical PermitNew Electrical Service Installing EV ChargersBoulder$36,860
Mar 17, 2026Electrical PermitReplace 200 A meter w 320A meter/panel combo unit. Refeed existing 200A panel Leave one 200 A breaker slot for future pool panel *See BLD-ACC2025-00133 for poolBoulder$5,545
Jan 28, 2026Electrical PermitReplacing 100A Main Panel with a new 200A main panel. Installing a 200A lever bypass meter socket. Install surge protection and bring grounding up to codeBoulder$4,000
Dec 9, 2025Electrical Permit**VOID** Move Xcel electric to temp meterBoulder—
Dec 8, 2025Electrical Permit*Voided for non-inspection. No inspections requested within 180 days.* Provide and install 1 new 3 phase 100 amp disconnect to replace the existing one. Unit H1Boulder$1,346
Oct 15, 2025Electrical PermitService Change/Upgrade service Existing is a 100amp 1phase overhead going to a 200amp 240v 1phase overheadBoulder—
Aug 19, 2025Electrical Permitreplacement of the electrical panel with a new panelBoulder$6,800
Jul 29, 2025Electrical Permitreplace meter housing as xcel energy has marked that it needs replacedBoulder$3,645

Permit status

Where its permits stand, as the departments report them.

  • Completed14
  • Closed12
  • Void6
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.