Contractor · Electrical
NB TRADING INC dba EXCEL ELECTRIC
33 building permits since 2017 in Boulder city, CO — $115,971 in reported job value over 21 permits that state one.
- Building permits
- 33
- Reported job value
- $116K
- Active
- 2017–2026
- Latest permit
- Mar 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boulder city, CO33
Permits by year
By issue date (application date where there is none).
048
7
20182020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2018 | 6 |
| 2019 | 4 |
| 2020 | 2 |
| 2021 | 4 |
| 2022 | 1 |
| 2023 | 1 |
| 2024 | 4 |
| 2025 | 7 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical33
- Electric meters8
- Bathrooms4
- Kitchens3
- Remodels3
- Demolition3
- Gas1
- HVAC1
- Plumbing1
- EV chargers1
Permit types
As the building departments classify them.
- Electrical Permit32
- Sign Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 19, 2026 | Electrical Permit | New Electrical Service Installing EV Chargers | Boulder | $36,860 |
| Mar 17, 2026 | Electrical Permit | Replace 200 A meter w 320A meter/panel combo unit. Refeed existing 200A panel Leave one 200 A breaker slot for future pool panel *See BLD-ACC2025-00133 for pool | Boulder | $5,545 |
| Jan 28, 2026 | Electrical Permit | Replacing 100A Main Panel with a new 200A main panel. Installing a 200A lever bypass meter socket. Install surge protection and bring grounding up to code | Boulder | $4,000 |
| Dec 9, 2025 | Electrical Permit | **VOID** Move Xcel electric to temp meter | Boulder | — |
| Dec 8, 2025 | Electrical Permit | *Voided for non-inspection. No inspections requested within 180 days.* Provide and install 1 new 3 phase 100 amp disconnect to replace the existing one. Unit H1 | Boulder | $1,346 |
| Oct 15, 2025 | Electrical Permit | Service Change/Upgrade service Existing is a 100amp 1phase overhead going to a 200amp 240v 1phase overhead | Boulder | — |
| Aug 19, 2025 | Electrical Permit | replacement of the electrical panel with a new panel | Boulder | $6,800 |
| Jul 29, 2025 | Electrical Permit | replace meter housing as xcel energy has marked that it needs replaced | Boulder | $3,645 |
Permit status
Where its permits stand, as the departments report them.
- Completed14
- Closed12
- Void6
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.