Contractor · Electrical

MICHAEL BLASS

33 building permits since 2011 in Stratford town, CT; Stamford town, CT and Bethel town, CT, across 6 counties — $255,390 in reported job value over 32 permits that state one.

Building permits
33
Reported job value
$255.4K
Active
2011–2026
Latest permit
Oct 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Stratford town, CT7
  • Stamford town, CT6
  • Bethel town, CT5
  • Brookfield town, CT3
  • New Fairfield town, CT3
  • Woodstock town, CT2
  • Griswold town, CT2
  • Enfield town, CT1
  • Bristol town, CT1
  • Ashford town, CT1

Permits by year

By issue date (application date where there is none).

048
8
20112015201920232026*
* 2026 is year to date.
View as table
YearPermits
20111
20138
20143
20151
20172
20184
20193
20212
20221
20233
20241
20251
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical29
  • Generators24
  • Gas3
  • HVAC2
  • Kitchens2
  • Electric meters2

Permit types

As the building departments classify them.

  • Electrical Permit20
  • ELECTRICAL5
  • Electrical3
  • Generator Permit Application3
  • Building Permit1
  • Stonington Generator Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 28, 2026Electrical PermitUp fit store to architect plans following the 2020 nec. Install new 120/208 panel fed from the 480 volt service , 480 volt panel is located in customers space ,Darien Town—
Oct 13, 2026Electrical PermitInstallation of 30 recessed light fixtures and swtches, arc fault will be used where requiredBrookfield Town$3,000
Jun 18, 2026Electrical PermitWire kitchen, cheese slicer, meat slicer, convection oven,pita oven, grease trap and deli caseEnfield Town$3,500
Jan 13, 2025Electrical PermitInstallation of electric baseboard heat throughout the 4 apartments. Heat will be installed at 10 watts a square foot. Forced hot ait electric heaters will be uGriswold Town$16,000
Oct 18, 2024Electrical PermitAdd owners meter, install all common area lighting. Wire all apartments to spec using the 2020 Nec. Install all wiring and fixtures. Install all subpanels in apGriswold Town$38,000
Jan 19, 2023Stonington Generator PermitInstallation of 22 kw Generac generator and whole house transfer switchStonington Town$11,000
Jan 12, 2023Building PermitInstallation of 24 kw Generac generator and 2 whole house transfer switches. Generator to bbe located near ac compressorsStamford Town$11,000
Jan 10, 2023Electrical Permitinstall 24 kw generac generator and whole house transfer switch, ac will be load shed. heat cooking and hotwater gasStamford Town$11,000

Permit status

Where its permits stand, as the departments report them.

  • Active16
  • Completed9
  • Issued4
  • Approved2
  • Void1
  • C/o issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.