Contractor · Electrical
john hagman
33 building permits since 2021 in Bridgewater Town city, MA; Plymouth town, MA and Easton town, MA, across 4 counties — $146,350 in reported job value over 27 permits that state one.
- Building permits
- 33
- Reported job value
- $146.4K
- Active
- 2021–2026
- Latest permit
- Aug 10, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bridgewater Town city, MA10
- Plymouth town, MA4
- Easton town, MA3
- Bellingham town, MA2
- Sharon town, MA2
- Lakeville town, MA2
- Falmouth town, MA1
- Taunton city, MA1
- Canton town, MA1
- Franklin Town city, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 3 |
| 2022 | 4 |
| 2023 | 10 |
| 2024 | 6 |
| 2025 | 3 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical33
- Bathrooms4
- Electric meters4
- HVAC2
- Remodels2
- Heat pumps2
- Pools & hot tubs2
- Accessory dwelling units1
- Kitchens1
- Additions1
Permit types
As the building departments classify them.
- ELECT.18
- Electrical Permit9
- Electrical Permit RESIDENTIAL One and Two Family3
- ELECT2
- Franklin Electrical Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 10, 2026 | ELECT. | Emergency Service Change, Residence lost one hot leg in meter socket | Stoughton Town | $5,000 |
| Aug 10, 2026 | ELECT. | wiring 2 car garage and bedroom addition | West Bridgewater Town | $15,000 |
| Jul 20, 2026 | ELECT. | — | Easton Town | — |
| Jul 14, 2026 | ELECT. | Vacant home was vandalized. Hot Water wiring and Dryer wiring removed along with copper plumbing. Installing new 30 amp HW heater wiring. Installing new 4 wire | Bridgewater Town City | $1,000 |
| May 29, 2026 | Electrical Permit | Upgrade service from 100 to 200 amps | Plymouth Town | $5,000 |
| Jan 21, 2026 | ELECT | service change | Bellingham Town | $5,000 |
| Jan 6, 2026 | Electrical Permit | Wiring 900 square Foot ADU | Marshfield Town | $11,500 |
| Oct 21, 2025 | ELECT. | Remove incorrectly wired generator breaker & transfer panel & outlet. Install separate ground buses in main panel to allow separation of neutrals & grounds. Fou | Bridgewater Town City | $1,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed21
- Issued5
- Active4
- Closed2
- Cancelled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.