Contractor · Plumbing
GEORGE OLESKE
33 building permits since 2015 in Buffalo city, NY and Clarence town, NY — $284,802 in reported job value over 32 permits that state one.
- Building permits
- 33
- Reported job value
- $284.8K
- Active
- 2015–2023
- Latest permit
- Dec 19, 2023
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Buffalo city, NY31
- Clarence town, NY2
Permits by year
By issue date (application date where there is none).
048
7
20152017201920212023
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2016 | 1 |
| 2017 | 3 |
| 2018 | 7 |
| 2019 | 6 |
| 2020 | 3 |
| 2021 | 6 |
| 2022 | 4 |
| 2023 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing33
- Bathrooms20
- Kitchens8
- Gas3
- Water heaters2
Permit types
As the building departments classify them.
- PLUMBING31
- Plumbing (Misc.)1
- Plumbing (Res. SGL R+R)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 19, 2023 | PLUMBING | rough and finish plumbing for 2nd floor 4 fixture master bath. connect onto existing 4 inch cast iron soil stack and 3/4 inch hot and cold risers | Buffalo City | $5,000 |
| Dec 14, 2023 | PLUMBING | install new pvc dwv and hot and cold waters lines to 1st floor 3 fixture bath, k.s., pantry sink and 2nd floor 3 fixture bath | Buffalo City | $8,000 |
| Dec 14, 2022 | PLUMBING | rough and finish plumbing to 1st floor k.s. and bar sink. move 3 inch soil stack to existing 2nd floor 3 fixture bath | Buffalo City | $4,500 |
| Jun 7, 2022 | PLUMBING | install new 3 inch pvc stack and water lines to 1st and 2nd floor 3 fixture baths, 2ks and 2 w/d | Buffalo City | $80,000 |
| Apr 20, 2022 | PLUMBING | replace all hot and cold galvanized water lines. replace galvanized and lead drain lines back to cast iron soil stack | Buffalo City | $7,000 |
| Feb 22, 2022 | PLUMBING | Rough and finish plumbing for two 2nd floor 3 fixture bathrooms. Connect onto existing 3/4 inch copper risers and 4 inch c.i. soil stack | Buffalo City | $6,000 |
| Nov 29, 2021 | PLUMBING | Rough and finish plumbing. Water, gas and dwv for apartments 1, 2, 7 and 8. 6 three fixture baths, 4 kitchens, 4 laundry, 2 hot water heaters and 6 floor drains | Buffalo City | $75,000 |
| Jul 20, 2021 | Plumbing (Misc.) | Plumbing (Misc.) | Clarence Town | $6,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.