Contractor · Electrical
BORRELLI'S ELECTRIC INC
33 building permits since 2016 in Sacramento city, CA and Merced city, CA, across 2 counties — $7,846,138 in reported job value over 33 permits that state one.
- Building permits
- 33
- Reported job value
- $7.8M
- Active
- 2016–2025
- Latest permit
- Dec 1, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA31
- Merced city, CA2
Permits by year
By issue date (application date where there is none).
048
8
20162018202120232025
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 3 |
| 2017 | 4 |
| 2018 | 1 |
| 2019 | 3 |
| 2021 | 6 |
| 2022 | 8 |
| 2023 | 3 |
| 2024 | 1 |
| 2025 | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical18
- Remodels12
- HVAC8
- Plumbing4
- Additions3
- Bathrooms1
- Generators1
- Demolition1
- Windows & doors1
- Electric meters1
Permit types
As the building departments classify them.
- Industrial25
- Office2
- Single Family2
- COMMERCIAL TENANT IMPROVEMENT1
- ELEC., PLUMB., MECH1
- Other Non-Res Bldgs1
- Other Struct (non-bldg)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 1, 2025 | Single Family | Upgrade existing 100A electrical panel to (N) 200A electrical panel. AA: existing panel 100 Amps - Overhead service, new main panel 200 Amps, main breaker repla | Sacramento | $3,500 |
| Jul 2, 2025 | Other Non-Res Bldgs | EPC - Adding 100AMP Temporary Power for temp installed SMUD Job Trailer. | Sacramento | $5,000 |
| Feb 11, 2025 | Single Family | Electrical Permit: Change out of a 200 electrical amp panel, like for like. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. | Sacramento | $3,500 |
| Jan 14, 2025 | Industrial | EPC - Install new 2000 amp 120/208 MSB and one new 400 amp panel. SEE REVISION COM-2602648: Removal of (E) Disconnects from One-Line approved plan set. Install | Sacramento | $143,326 |
| May 1, 2024 | Industrial | EPC - Install 3 new Dedicated circuits to Tissue Culture room. | Sacramento | $5,000 |
| Nov 7, 2023 | Office | EPC - Provide temporary Generator so that SMUD can do a utility cutover. No physical work will be done to the building. | Sacramento | $50,000 |
| Apr 19, 2023 | Industrial | EPC - 23-000700 cannabis -- NEW FLOOR DRAIN AND SUMP PUMP FOR ICE MACHINE & MECHANICAL CONDENSATE. suite 500 | Sacramento | $10,000 |
| Feb 9, 2023 | Industrial | EPC - cannabis Replacement of existing HPS Grow Light fixtures in Room #3 with new LED Grow Lights | Sacramento | $8,000 |