Contractor · Electrical
ALLSTAR ELECTRICAL SVCS
33 building permits since 2001 in Thornton city, CO — $200,550 in reported job value over 8 permits that state one.
- Building permits
- 33
- Reported job value
- $200.6K
- Active
- 2001–2024
- Latest permit
- Feb 21, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Thornton city, CO33
Permits by year
By issue date (application date where there is none).
02.55
5
200120052008201420202024
View as tableHide table
| Year | Permits |
|---|---|
| 2001 | 2 |
| 2002 | 5 |
| 2003 | 1 |
| 2005 | 1 |
| 2006 | 1 |
| 2007 | 4 |
| 2008 | 5 |
| 2010 | 2 |
| 2011 | 1 |
| 2014 | 2 |
| 2016 | 1 |
| 2019 | 1 |
| 2020 | 2 |
| 2022 | 2 |
| 2023 | 1 |
| 2024 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical20
- Remodels7
- EV chargers4
- HVAC3
- Electric meters3
- Kitchens1
- Telecom1
- Bathrooms1
- Generators1
- New construction1
Permit types
As the building departments classify them.
- Electrical19
- Residential Alteration4
- Commercial Alteration3
- Mechanical3
- Commercial Miscellaneous2
- Residential Miscellaneous2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 21, 2024 | Electrical | Install 50A EV circuit and level 2 charger | Thornton | $300 |
| Jan 8, 2024 | Electrical | Install 50A EV circuit and level 2 charger | Thornton | $1,800 |
| Sep 11, 2023 | Electrical | Main Service Upgrade,pick up existing circuits,new feed to gareage sub-panel. | Thornton | $6,500 |
| Sep 12, 2022 | Electrical | 50A 220V circuit for EV Charging Station | Thornton City | $6,000 |
| Sep 12, 2022 | Electrical | 50A 220V EV Charger Circuit | Thornton City | $6,000 |
| Sep 22, 2020 | Electrical | Change-out Xcel Meter Housing due to melt down on lugs No new loads Existing main breaker panel | Thornton | $950 |
| Mar 24, 2020 | Electrical | Install owner-furnished B.A. Fans. Spec sheets attached. Existing panels. Fans will be installed as follows on Floor RSP-1 = 47 fans, RSP-2 = 48 fans, RSP-3 = 4 | Thornton | $148,000 |
| Feb 21, 2019 | Electrical | Upgrade to 150 amps, pick up existing service circuits - new dryer 220v circuit | Thornton | — |
Permit status
Where its permits stand, as the departments report them.
- Closed30
- Expired2
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.