Contractor · Electrical

LYTEGEN

34 building permits since 2026 in Stockton city, CA; Oxnard city, CA and Oakland city, CA, across 10 counties.

Building permits
34
Reported job value
—
Active
2026
Latest permit
Mar 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Stockton city, CA9
  • Oxnard city, CA6
  • Oakland city, CA4
  • Placer County, CA2
  • Hemet city, CA2
  • Lancaster city, CA2
  • Manteca city, CA2
  • San Bernardino County, CA1
  • Fontana city, CA1
  • Moreno Valley city, CA1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical34
  • Solar30
  • Battery storage17
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical34

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 26, 2026ElectricalSolar app - roof mount solar 4.79 pv system - with battery proposedWest Sacramento City—
Mar 23, 2026ElectricalResidential roof top pv 5.590kw - solarapp+ id: sa20260323-6255-164-15802-aSan Bernardino County—
Mar 16, 2026ElectricalPermit for installation of roof mount pv system to consist of 9.890kw w/ 23 modules & 1 battery for energy storage.Fontana City—
Mar 10, 2026ElectricalSa20260310-13378-63-15802-aHemet City—
Mar 9, 2026ElectricalSymbium-project_db6722dc-50ae-4418-b6a8-d494b595d5d5:install 12 pv modules (5.16kw) with tesla inc. Inverter; install 1 ess unit, location = outdoorsLancaster City—
Mar 5, 2026ElectricalE-permit: solar app application id - sa20260305-150-123-15802-a, residential - 13.330kw photovoltaic system main breaker replacement: - no, battery backup unitsStockton City—
Mar 4, 2026ElectricalE-permit: solar app application id - sa20260302-150-115-15802-a, residential - 3.87kw photovoltaic system main breaker replacement: - no, battery backup units: Stockton City—
Mar 4, 2026ElectricalThe installation includes 19 qcells q.tron blk m-g2+ 430w pv modules, and 1 tesla powerwall 3 1707000-21 energy storage system, and safety equipment. Subpanel iOakland City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled25
  • Active7
  • Pending1
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.