Contractor · General building
Daniel Ruffini
34 building permits since 2011 in Boston city, MA; Milton town, MA and Quincy city, MA, across 4 counties — $767,868 in reported job value over 34 permits that state one.
- Building permits
- 34
- Reported job value
- $767.9K
- Active
- 2011–2025
- Latest permit
- Jun 12, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boston city, MA19
- Milton town, MA10
- Quincy city, MA2
- Waltham city, MA1
- Braintree Town city, MA1
- Hanover town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2011 | 3 |
| 2012 | 1 |
| 2013 | 1 |
| 2014 | 1 |
| 2015 | 5 |
| 2016 | 2 |
| 2017 | 3 |
| 2018 | 1 |
| 2019 | 1 |
| 2020 | 1 |
| 2021 | 4 |
| 2022 | 3 |
| 2023 | 4 |
| 2024 | 2 |
| 2025 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels6
- Bathrooms6
- Additions3
- Roofing2
- HVAC1
- Windows & doors1
Permit types
As the building departments classify them.
- RESI.11
- INTREN8
- EXTREN6
- Building Permit Application2
- INTEXT2
- SIDE2
- ADDITION1
- Building Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 12, 2025 | RESI. | full bathroom remodel no movement of fixtures same floor plan | Milton Town | $18,000 |
| Jun 3, 2025 | RESI. | replace roof and siding, remove asbestos transite siding by qualified abetment contractor | Milton Town | $57,550 |
| May 8, 2024 | RESI. | finish basement adding perimeter walls, mechanical room and laundry with proposed 1/2 bath in existing laundry room. install erv or hrv | Milton Town | $80,490 |
| Mar 22, 2024 | Building Permit Application | Install partition wall in attic with door | Quincy City | $4,500 |
| Jul 21, 2023 | Porch(es) | REMOVE EXISTING PORCH- REBUILD PORCH TO SMALLER FOOTPRINT PER APPROVED PLANS | Waltham City | $6,000 |
| Jun 6, 2023 | RESI. | remodel existing second floor bathroom, convert tub to shower... | Milton Town | $24,000 |
| Mar 22, 2023 | RESI. | build rear landing and stairs as per plans submitted | Milton Town | $6,500 |
| Jan 25, 2023 | RESI. | remodel bathroom removing tub and installing shower , reconfigure existing laundry room adding approx. 20 sf | Braintree Town City | $35,000 |
Permit status
Where its permits stand, as the departments report them.
- Active15
- Closed8
- Finaled7
- Issued3
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.