Contractor · Electrical
CENTRAL OREGON ELECTRIC LLC
34 building permits since 2009 in Bend city, OR; Benton County, OR and Deschutes County, OR, across 3 counties — $4,832,011 in reported job value over 14 permits that state one.
- Building permits
- 34
- Reported job value
- $4.8M
- Active
- 2009–2026
- Latest permit
- Sep 25, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bend city, OR30
- Benton County, OR1
- Deschutes County, OR1
- Marion County, OR1
- Redmond city, OR1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2009 | 1 |
| 2017 | 1 |
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 6 |
| 2022 | 5 |
| 2023 | 2 |
| 2024 | 4 |
| 2025 | 6 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical20
- New construction12
- Electric meters2
- Accessory dwelling units1
- Gas1
- Remodels1
- Plumbing1
Permit types
As the building departments classify them.
- Electrical18
- New Construction/Installation11
- New - Single Family Dwelling2
- Commercial Electrical1
- Illuminated Sign1
- Residential Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 25, 2026 | Electrical | (2) temp power poles *duplex PRNC202604429* | Bend | — |
| Jul 24, 2026 | Electrical | Move TDS pedestal and service no conditions chw | Bend | — |
| Jun 18, 2026 | Electrical | temporary power for new construction site ***No relevant conditions/No expired*** SN ***w/PRNC202601792*** SN | Bend | — |
| Jun 12, 2026 | Electrical | 100 amp service with two branch circuits relocation of TDS equipment | Bend | — |
| Mar 6, 2026 | Illuminated Sign | Wall signage, total area 43.3 sq ft, nonilluminated, located on the east elevation. All other worksheets for signs including freestanding sign are withdrawn. | Bend | — |
| Jan 26, 2026 | Electrical | 61130 PARKWOOD CT. Is in the middle of a final plat to our partition. New sewer, water(already partial pass) ,and electrical mains are needed to finalize plat. | Bend | — |
| Oct 20, 2025 | Electrical | Install new circuit for propane dispenser No expireds/conditions | Bend | — |
| Aug 28, 2025 | Electrical | Set new 400 amp service ***No Conditions/No Expired*** SN *standalone service for quadplex* | Bend | — |
Permit status
Where its permits stand, as the departments report them.
- Closed21
- Issued5
- Expired4
- Finaled4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.