Contractor · Specialty (solar, fire, telecom)

ARE SOLAR

34 building permits since 2016 in Boulder County, CO; Broomfield County, CO and Adams County, CO, across 3 counties — $1,281,079 in reported job value over 29 permits that state one.

Building permits
34
Reported job value
$1.3M
Active
2016–2025
Latest permit
Sep 11, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder County, CO27
  • Broomfield County, CO5
  • Adams County, CO2

Permits by year

By issue date (application date where there is none).

07.515
12
20162018202020222025
View as table
YearPermits
20162
20177
20183
201912
20203
20211
20221
20241
20254

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar34
  • Electrical25
  • Plumbing1
  • Water heaters1

Permit types

As the building departments classify them.

  • Residential Roof Mounted Solar Electrical System20
  • Solar Electrical System5
  • B-Add/Alt Solar Panel/Res3
  • B-Add/Alt Solar PV Remove/Replace2
  • Solar Other2
  • Building Permit - Plan Review Required1
  • Residential Solar1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 11, 2025B-Add/Alt Solar Panel/ResSolar PV SystemBroomfield County—
Jun 2, 2025B-Add/Alt Solar Panel/ResSolar PV SystemBroomfield County—
Apr 24, 2025B-Add/Alt Solar PV Remove/ReplaceSolar Removal / ReplacementBroomfield County—
Apr 10, 2025B-Add/Alt Solar PV Remove/ReplaceSolar PV Remove and ReinstallBroomfield County—
Sep 6, 2024Residential Roof Mounted Solar Electrical SystemSolar PV System - 7.7 kW Flush Mount, Grid TiedBoulder County$10,491
Sep 1, 2022Residential SolarRES - SOLAR - 18.48 PV Solar Ground MountAdams County$60,758
May 7, 2021B-Add/Alt Solar Panel/ResSolar PV SystemBroomfield County—
May 21, 2020Residential Roof Mounted Solar Electrical SystemInstall 20.8 KW Flush Mount Solar PV SystemBoulder County$72,800

Permit status

Where its permits stand, as the departments report them.

  • Completed25
  • Not stated5
  • Issued2
  • Finaled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.