Contractor · Specialty (solar, fire, telecom)

ADVANCED SOLAR

34 building permits since 2021 in San Diego County, CA; Oceanside city, CA and Vista city, CA.

Building permits
34
Reported job value
—
Active
2021–2024
Latest permit
Apr 11, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA32
  • Oceanside city, CA1
  • Vista city, CA1

Permits by year

By issue date (application date where there is none).

01020
20
2021202220232024
View as table
YearPermits
20217
20226
202320
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar33
  • Roofing1
  • Electrical1

Permit types

As the building departments classify them.

  • Building Misc - Photovoltaic System (PV)1
  • SFD SOLAR PV1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 11, 2024Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEMVista City—
Nov 8, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Sep 14, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Aug 18, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Aug 16, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jul 26, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jun 8, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Jun 7, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Issued21
  • Active11
  • Finaled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.