Contractor · General building
WHOLE BUILDERS COOP INC
35 building permits since 2017 in Minneapolis city, MN — $2,196,481 in reported job value over 35 permits that state one.
- Building permits
- 35
- Reported job value
- $2.2M
- Active
- 2017–2026
- Latest permit
- Sep 21, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN35
Permits by year
By issue date (application date where there is none).
048
7
20182020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 7 |
| 2018 | 4 |
| 2019 | 3 |
| 2020 | 2 |
| 2021 | 4 |
| 2022 | 2 |
| 2023 | 2 |
| 2024 | 4 |
| 2025 | 3 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels19
- Kitchens13
- Windows & doors13
- Bathrooms10
- Electrical10
- Plumbing9
- Demolition8
- HVAC7
- Additions7
- Roofing4
Permit types
As the building departments classify them.
- Res30
- Commercial5
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 21, 2026 | Commercial | IMPROVE SOUND CONTROL AT "CONFERENCE ROOM" 2020 MSBC architect: 19352 - Isenberg, Jay H | Minneapolis City | $15,100 |
| Sep 1, 2026 | Res | interior maintenance, patching and repairing walls and ceilings. install draintile and sump in basement. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESO | Minneapolis City | $48,000 |
| Jul 29, 2026 | Res | (DMH-Pdox) KITCHEN DEMO AND REMODEL IN SFD. NO STRUCTURAL CHANGE. NO WINDOW REPLACMENT. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PRO | Minneapolis City | $38,000 |
| May 6, 2026 | Res | Add 1/2 bathroom to first floor -ACW Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, | Minneapolis City | $22,900 |
| Aug 18, 2025 | Res | (DMH-Pdox) FRAME & FINISH FOR NEW 3/4 BATHROOM ADJACENT TO KITCHEN IN SFD. 10/17/25 - R.A.I. Install Transom window above door in lieu of Tempered window next t | Minneapolis City | $31,100 |
| Aug 18, 2025 | Res | (DMH-Pdox) DEMO CEILING FINISHES AT KITCHEN, DINING & SELECT BASEMENT LEVEL IN SFD. SISTER SELECT FLOOR JOISTS ABOVE DINING AND REMODEL KITCHEN. FRAME & FINISH | Minneapolis City | $101,500 |
| Mar 20, 2025 | Commercial | REMODEL OF EXISTING ASSEMBLY SPACE. NO STRUCTURAL WORK. (JJL) certificate of occupancy required: no special inspections required: no const type: III-B occupancy | Minneapolis City | $33,000 |
| Nov 7, 2024 | Res | NON-STRUCTURAL REMODEL AT MASTER BATHROOM - DEMO EXISTING TUB & SURROUND, WC, AND LAV - REPLACE WITH NEW IN SAME LOCATIONS WITH NEW WALK-IN SHOWER & GRAB BARS A | Minneapolis City | $20,617 |
Permit status
Where its permits stand, as the departments report them.
- Closed31
- Issued2
- Expired1
- Cancelled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.