Contractor · General building
Smith Peter
35 building permits since 2015 in Orleans Parish, LA.
- Building permits
- 35
- Reported job value
- —
- Active
- 2015–2026
- Latest permit
- Sep 25, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Orleans Parish, LA35
Permits by year
By issue date (application date where there is none).
07.515
12
20162019202120232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 5 |
| 2016 | 1 |
| 2018 | 1 |
| 2019 | 12 |
| 2020 | 4 |
| 2021 | 3 |
| 2022 | 4 |
| 2023 | 2 |
| 2024 | 2 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels24
- Bathrooms16
- Kitchens14
- Windows & doors9
- HVAC8
- New construction7
- Roofing5
- Electrical5
- Additions4
- Plumbing4
Permit types
As the building departments classify them.
- Renovation (Non-Structural)11
- New Construction7
- Renovation (Structural)7
- Demolition2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 25, 2026 | — | Porch renovation. Remove porch walls. Extend porch. Add columns. Expand porch roof. Paint all new finishes. After the fact permit/fees paid. | Orleans Parish | — |
| Jul 24, 2024 | Demolition | Demo of existing home and slab | Orleans Parish | — |
| Jan 2, 2024 | Renovation (Non-Structural) | Interior patch and paint. Kitchen remodel (new cabinets and countertops). Refinish floors. Paint exterior. New plumbing and electrical fixtures.Redo was tile in | Orleans Parish | — |
| Apr 26, 2023 | — | Full renovation of a double. New roof, siding, windows, exterior paint. Some framing, drywall, insect damage repair. Renovation of three bathrooms, two kitchens | Orleans Parish | — |
| Mar 31, 2023 | Renovation (Structural) | Renovation of existing location to a distillery. All work to be done as per plans. TCO Issued for 90 Days on 4-30-24. DPW and CPC Inspections Required FINAL OCC | Orleans Parish | — |
| Aug 26, 2022 | New Construction | New Construction | Orleans Parish | — |
| Aug 10, 2022 | New Construction | New Construction | Orleans Parish | — |
| Jul 28, 2022 | Demolition | Demolition of the structure and flat work | Orleans Parish | — |
Permit status
Where its permits stand, as the departments report them.
- C/o issued25
- Closed5
- Issued4
- Finaled1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.