Contractor · General building

Smith Peter

35 building permits since 2015 in Orleans Parish, LA.

Building permits
35
Reported job value
—
Active
2015–2026
Latest permit
Sep 25, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA35

Permits by year

By issue date (application date where there is none).

07.515
12
20162019202120232026*
* 2026 is year to date.
View as table
YearPermits
20155
20161
20181
201912
20204
20213
20224
20232
20242
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels24
  • Bathrooms16
  • Kitchens14
  • Windows & doors9
  • HVAC8
  • New construction7
  • Roofing5
  • Electrical5
  • Additions4
  • Plumbing4

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)11
  • New Construction7
  • Renovation (Structural)7
  • Demolition2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 25, 2026—Porch renovation. Remove porch walls. Extend porch. Add columns. Expand porch roof. Paint all new finishes. After the fact permit/fees paid.Orleans Parish—
Jul 24, 2024DemolitionDemo of existing home and slabOrleans Parish—
Jan 2, 2024Renovation (Non-Structural)Interior patch and paint. Kitchen remodel (new cabinets and countertops). Refinish floors. Paint exterior. New plumbing and electrical fixtures.Redo was tile inOrleans Parish—
Apr 26, 2023—Full renovation of a double. New roof, siding, windows, exterior paint. Some framing, drywall, insect damage repair. Renovation of three bathrooms, two kitchensOrleans Parish—
Mar 31, 2023Renovation (Structural)Renovation of existing location to a distillery. All work to be done as per plans. TCO Issued for 90 Days on 4-30-24. DPW and CPC Inspections Required FINAL OCCOrleans Parish—
Aug 26, 2022New ConstructionNew ConstructionOrleans Parish—
Aug 10, 2022New ConstructionNew ConstructionOrleans Parish—
Jul 28, 2022DemolitionDemolition of the structure and flat workOrleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • C/o issued25
  • Closed5
  • Issued4
  • Finaled1

Also on file as

The same name elsewhere

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.