Contractor · Electrical
ROSENDIN ELECTRIC INC
35 building permits since 2005 in Bend city, OR; Forest Grove city, OR and Redmond city, OR, across 6 counties — $314,780 in reported job value over 13 permits that state one.
- Building permits
- 35
- Reported job value
- $314.8K
- Active
- 2005–2026
- Latest permit
- Oct 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bend city, OR22
- Forest Grove city, OR3
- Redmond city, OR3
- Columbia County, OR2
- Marion County, OR2
- Corvallis city, OR2
- Clatsop County, OR1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2005 | 1 |
| 2007 | 1 |
| 2013 | 2 |
| 2021 | 1 |
| 2023 | 3 |
| 2024 | 3 |
| 2025 | 12 |
| 2026 (YTD) | 12 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical24
- HVAC8
- Remodels5
- Fire sprinklers4
- Grading & excavation1
- Bathrooms1
- Plumbing1
- Heat pumps1
- Demolition1
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical18
- Commercial Electrical4
- Fire Sprinkler/Alarm4
- Residential Manufactured Dwelling2
- Alteration - Commercial1
- Commercial Structural1
- New - Commercial1
- Renovation/Alteration1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 13, 2026 | Commercial Structural | Seismic engineering for anchorage of cable tray and tele data network racks. | Forest Grove | $12,000 |
| Oct 12, 2026 | Electrical | Adding 1 single phase- 208v 20 amp circuit for a mini split and 1- 120v 20 amp circuit for a service receptacle to an existing 100 amp panel previously calculat | Bend | — |
| Sep 23, 2026 | Electrical | OSU Construction Office Modular Trailer | Corvallis | — |
| Aug 20, 2026 | Electrical | Minor electrical work needed to assist in GE replacing X-Ray 4 in The Center *Per Dan, equipment is being replaced like for like, electrical only* [Darcy Seal @ | Bend | — |
| Aug 20, 2026 | Electrical | Minor electrical work needed to assist in GE replacing X-Ray 2 in The Center ***2nd FLOOR*** *Per Dan, equipment is being replaced like for like, electrical onl | Bend | — |
| Aug 5, 2026 | Electrical | VOID | Corvallis | — |
| Jul 28, 2026 | Electrical | Add & relocate data for exam room remodel. | Bend | — |
| Jul 22, 2026 | Electrical | Adding a magnetic door holder to an office door in the East Surgery Suite of the St. Charles Bend hospital. Tapping into the existing electrical power circuit a | Bend | — |
Permit status
Where its permits stand, as the departments report them.
- Closed15
- Expired7
- Finaled6
- Issued5
- Void1
- Withdrawn1
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.