Contractor · Specialty (solar, fire, telecom)
N R C I_TELECOM
35 building permits since 2015 in Sacramento County, CA; Sacramento city, CA and Kings County, CA, across 4 counties — $1,798,000 in reported job value over 28 permits that state one.
- Building permits
- 35
- Reported job value
- $1.8M
- Active
- 2015–2026
- Latest permit
- Oct 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA20
- Sacramento city, CA6
- Kings County, CA5
- Marin County, CA2
- Elk Grove city, CA1
- Madera city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 1 |
| 2016 | 4 |
| 2021 | 3 |
| 2022 | 8 |
| 2023 | 8 |
| 2025 | 7 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Telecom25
- Generators7
- Electrical7
- Battery storage3
- Electric meters2
- Remodels1
Permit types
As the building departments classify them.
- CBNC8
- Other Struct (non-bldg)6
- 3295
- COXX5
- CBAC4
- APPR2
- CELL TOWER2
- RESIDENTIAL2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 13, 2026 | CELL TOWER | EXISTING CELL TOWER MODIFCATIONS (9) ANTENNAS REMOVE AND REPLACE | Madera City | $25,000 |
| Mar 23, 2026 | CBAC | SELFSUPORT WORK: REMOVE (6) 1 1/4" COAX CABLES LOWER (3) AIR6449 B77D ANTENNAS INSTAL (3) AIR6419 B77G ANTENNAS INSTAL (3) 4890 B25/B66 RRUs INSTAL TOWERMODIFIC | Sacramento County | $65,000 |
| Dec 29, 2025 | CBNC | Christ Unity Church: THIS PROJECT ENTAILS THE CONSTRUCTION OF A NEW 80' TOWER AND THE REMOVAL OF THE EXISTING TOWER ONCE THE NEW TOWER IS FULLY FUNCTIONAL. | Sacramento County | $75,000 |
| Oct 15, 2025 | CBNC | Cell Tower Installation to include a new 65' tall tower with supporting ground based equipment and backup diesel generator. | Sacramento County | $250,000 |
| Sep 29, 2025 | CBAC | Tower reinforcement project at existing wireless facility. Install thread rods, bolts and brackets on existing tower. REV01 Tower reinforcements to include exte | Sacramento County | $5,000 |
| Mar 15, 2025 | CBAC | (MAIN CASE = CBNC2021-00211) AT&T co-location on existing monopole wireless communication Install (9) antennas, (15) RRUs, (3) surge suppressors, associated equ | Sacramento County | $75,000 |
| Mar 15, 2025 | CBAC | EXTEND EXISTING 120' MONOPOLE TO 140'. | Sacramento County | $50,000 |
| Mar 15, 2025 | CBNC | AT&T co-location on existing monopole wireless communication (MAIN CASE) Install of an 8'x8' walk-in shelter w/ perimeter access gate., CH-01 - Please see the r | Sacramento County | $50,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued19
- Not stated7
- Completed6
- Closed1
- Finaled1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.