Contractor · Electrical
Infinity Solar
35 building permits since 2014 in Anaheim city, CA; Fullerton city, CA and Orange city, CA, across 2 counties — $7,000 in reported job value over 2 permits that state one.
- Building permits
- 35
- Reported job value
- $7K
- Active
- 2014–2026
- Latest permit
- Feb 26, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Anaheim city, CA22
- Fullerton city, CA3
- Orange city, CA2
- Tustin city, CA2
- Yorba Linda city, CA2
- Brea city, CA1
- Huntington Beach city, CA1
- Los Angeles city, CA1
- Newport Beach city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2014 | 1 |
| 2017 | 1 |
| 2018 | 1 |
| 2019 | 9 |
| 2020 | 3 |
| 2021 | 4 |
| 2022 | 1 |
| 2023 | 1 |
| 2024 | 1 |
| 2026 (YTD) | 13 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical27
- Solar25
- New construction5
- Battery storage4
- Roofing2
- EV chargers2
Permit types
As the building departments classify them.
- Electrical9
- Automated - Residential Single Main Panel Upgrade (Up to 225 AMP) & Subpanel Upgrades2
- Electrical - Service Change2
- SolarAPP+ Permit for Photovoltaic Systems1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 26, 2026 | Electrical | New 225a backup subpanel. New upgraded main service panel 200a buss/200a main. New tesla backup switch | Brea City | — |
| Feb 24, 2026 | Electrical | Photovoltaic system with microinverter: install residential roof mounted solar (6) modules and (6) microinverter (bld2025-00511, 00512, 00513) | Anaheim City | — |
| Feb 19, 2026 | Electrical | 10.560 (dc) 9.615 (ac) kw roof mounted photovoltaic system with 24 panels. Electrical panel upgrade to 225 amp bus/200 amp main breaker and install 50 amp ev ch | Yorba Linda City | — |
| Feb 17, 2026 | Electrical | Roof mount solar with 4.4 kw and 10 panels | Yorba Linda City | — |
| Feb 11, 2026 | SolarAPP+ Permit for Photovoltaic Systems | Installation of a 15.4 KW DC photovoltaic system consisting of 35 modules & (1) Tesla Powerwall 3 battery + (1) Tesla expansion unit (13.5 kwh each). Including | Fullerton City | — |
| Jan 28, 2026 | Electrical | New upgraded main service panel 225a buss/200a main | Orange City | — |
| Jan 27, 2026 | Electrical - Service Change | upgraded main service panel 225A buss/ 200A main | Tustin City | $3,500 |
| Jan 27, 2026 | Electrical - Service Change | upgraded main service panel 225A buss/ 200A main | Tustin City | $3,500 |
Permit status
Where its permits stand, as the departments report them.
- Not stated22
- Active5
- Finaled5
- Completed3
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.