Contractor · Electrical

Infinity Solar

35 building permits since 2014 in Anaheim city, CA; Fullerton city, CA and Orange city, CA, across 2 counties — $7,000 in reported job value over 2 permits that state one.

Building permits
35
Reported job value
$7K
Active
2014–2026
Latest permit
Feb 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Anaheim city, CA22
  • Fullerton city, CA3
  • Orange city, CA2
  • Tustin city, CA2
  • Yorba Linda city, CA2
  • Brea city, CA1
  • Huntington Beach city, CA1
  • Los Angeles city, CA1
  • Newport Beach city, CA1

Permits by year

By issue date (application date where there is none).

07.515
13
20172019202120232026*
* 2026 is year to date.
View as table
YearPermits
20141
20171
20181
20199
20203
20214
20221
20231
20241
2026 (YTD)13

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical27
  • Solar25
  • New construction5
  • Battery storage4
  • Roofing2
  • EV chargers2

Permit types

As the building departments classify them.

  • Electrical9
  • Automated - Residential Single Main Panel Upgrade (Up to 225 AMP) & Subpanel Upgrades2
  • Electrical - Service Change2
  • SolarAPP+ Permit for Photovoltaic Systems1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 26, 2026ElectricalNew 225a backup subpanel. New upgraded main service panel 200a buss/200a main. New tesla backup switchBrea City—
Feb 24, 2026ElectricalPhotovoltaic system with microinverter: install residential roof mounted solar (6) modules and (6) microinverter (bld2025-00511, 00512, 00513)Anaheim City—
Feb 19, 2026Electrical10.560 (dc) 9.615 (ac) kw roof mounted photovoltaic system with 24 panels. Electrical panel upgrade to 225 amp bus/200 amp main breaker and install 50 amp ev chYorba Linda City—
Feb 17, 2026ElectricalRoof mount solar with 4.4 kw and 10 panelsYorba Linda City—
Feb 11, 2026SolarAPP+ Permit for Photovoltaic SystemsInstallation of a 15.4 KW DC photovoltaic system consisting of 35 modules & (1) Tesla Powerwall 3 battery + (1) Tesla expansion unit (13.5 kwh each). Including Fullerton City—
Jan 28, 2026ElectricalNew upgraded main service panel 225a buss/200a mainOrange City—
Jan 27, 2026Electrical - Service Changeupgraded main service panel 225A buss/ 200A mainTustin City$3,500
Jan 27, 2026Electrical - Service Changeupgraded main service panel 225A buss/ 200A mainTustin City$3,500

Permit status

Where its permits stand, as the departments report them.

  • Not stated22
  • Active5
  • Finaled5
  • Completed3

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.