Contractor · Electrical
ELITE POWER AND ENERGY CORPORATION
35 building permits since 2021 in Arlington County, VA; Howard County, MD and Chesterfield County, VA, across 5 counties — $92,199 in reported job value over 12 permits that state one.
- Building permits
- 35
- Reported job value
- $92.2K
- Active
- 2021–2026
- Latest permit
- Oct 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Arlington County, VA11
- Howard County, MD8
- Chesterfield County, VA8
- Rockville city, MD4
- Gloucester County, VA4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 8 |
| 2022 | 12 |
| 2023 | 8 |
| 2024 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Generators28
- Electrical16
- Plumbing14
- Gas13
- Remodels6
- Additions6
- HVAC1
- Water heaters1
- Electric meters1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- Electrical5
- Plumbing5
- Permit Issue4
- Residential Electrical4
- Residential Gas4
- Residential Electrical Addition Alteration Permit3
- Residential Plumbing Addition Alteration Permit3
- Mechanical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 19, 2026 | Electrical | Emergency disconnect is fed from the CT cabinet, not the 60A breaker. Dominion access, an outage, and permits are required to pull and terminate the third leg. | Arlington County | — |
| Sep 30, 2026 | Electrical | Emergency disconnect is fed from the CT cabinet. Dominion will need to schedule an outage to access the CT cabinet and pull the third leg to the emergency disco | Arlington County | — |
| Jun 25, 2026 | Residential Electrical | Install manual transfer switch for portable generator 50-amp with plug. | Chesterfield County | $300 |
| Jun 25, 2026 | Residential Gas | Install 320 above ground propane tank and line and tankless water heater. | Chesterfield County | $1,000 |
| Feb 28, 2025 | — | — | Rockville City | — |
| Feb 6, 2024 | Plumbing | Installation of a Cummins RS20kW, 120/240V backup generator and a Cummins RA200 200Amp Automatic Transfer Switch (ATS). Gas hookup | Arlington County | — |
| Feb 2, 2024 | Electrical | Installation of a Cummins RS20kW, 120/240V Backup Generator and a Cummins RA200 200 Amp Automatic Transfer Switch (ATS.) | Arlington County | — |
| Oct 10, 2023 | Plumbing | Install Generator, pipe to split meter | Arlington County | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled9
- Issued8
- Completed8
- Not stated4
- Closed2
- Pending2
- Pending payment2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.