Contractor · General building

Benjamin Riordan

35 building permits since 2015 in Santa Cruz city, CA; Santa Cruz County, CA and Capitola city, CA — $1,314,585 in reported job value over 22 permits that state one.

Building permits
35
Reported job value
$1.3M
Active
2015–2026
Latest permit
Sep 21, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz city, CA26
  • Santa Cruz County, CA8
  • Capitola city, CA1

Permits by year

By issue date (application date where there is none).

0510
10
201620182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20154
20162
20172
20184
201910
20203
20211
20222
20233
20241
20252
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels8
  • Bathrooms6
  • Accessory dwelling units5
  • Solar4
  • Electrical4
  • HVAC3
  • Gas2
  • Battery storage2
  • Additions2
  • Plumbing2

Permit types

As the building departments classify them.

  • Residential Building17
  • Building8
  • Building Repair4
  • Mechanical3
  • B-Residential1
  • Demolition1
  • Roofing1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 21, 2026BuildingCONSTRUCTION CHANGE DOCUMENT #1 TO DEF PV PERMIT B-256739 TO INCLUDE THE FOLLOWING: EQUIPMENT CHANGES: ADDING (1) MODULE (4.76)KW TO RESULT IN (14) MODULES IN TSanta Cruz County—
Dec 31, 2025BuildingDEFERRED SUBMITTAL #1 TO BUILDING PERMIT B-242905 TO INCLUDE FOLLOWING: INSTALL A ROOF MOUNT (4.42)KW, (13) MODULES PHOTOVOLTAIC ELECTRICAL SYSTEM NOT TO EXCEEDSanta Cruz County—
Jul 16, 2025BuildingCZU FIRE REBUILD - CONSTRUCT A 1600 SF SINGLE-FAMILY DWELLING WITH 2 BEDROOMS & 2 BATHROOMS, A 500 SQFT COVERED PORCH, AND 1020 SQFT HARDSCAPE PATIO, WITH A 20 Santa Cruz County—
Jul 3, 2024BuildingCZU FIRE - CONSTRUCT A 1850 SQFT 3 BD / 2 BA SFD, W/ AN ATTACHED 320 SQFT COVERED DECK, 880 SQFT UNCOVERED DECK, AND A 60 SQFT CONCRETE PORCH AT ENTRY OF DWELLISanta Cruz County—
Aug 14, 2023BuildingARD2023 - Special inspection to determine storm damage to existing deck from storms. Flood Zone: AE & XSanta Cruz County—
May 1, 2023Residential BuildingNew Detached ADU Legalization Garage ConversionSanta Cruz City$138,787
Apr 27, 2023BuildingART STUDIO / WORKSHOP (700) W/ ONE HALF BATH, COVERED PATIO (280)Santa Cruz County—
Aug 15, 2022BuildingCZU FIRE PROTECTION STORAGE TANKS (2x5,000gal) AND WHARF HEAD HYDRANT SCCFPD 605 LAST CHANCE Batch ran @ 11/1/2023 8:15:56 PM Batch ran @ 11/22/2023 8:16:42 PMSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed29
  • Active2
  • Expired2
  • Finaled1
  • Pending payment1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.