Contractor · Electrical

William Hall

36 building permits since 2020 in Greene County, NC; Lenoir County, NC and Gaston County, NC, across 4 counties — $286,177 in reported job value over 10 permits that state one.

Building permits
36
Reported job value
$286.2K
Active
2020–2026
Latest permit
Aug 6, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Greene County, NC28
  • Lenoir County, NC4
  • Gaston County, NC3
  • Pitt County, NC1

Permits by year

By issue date (application date where there is none).

07.515
15
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20201
20211
202215
20237
20247
20253
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical29
  • HVAC9
  • Plumbing4
  • Electric meters4
  • Gas3
  • Remodels3
  • Heat pumps2
  • Kitchens1
  • Roofing1
  • Additions1

Permit types

As the building departments classify them.

  • Electrical Permit Application22
  • Mechanical Permit Application6
  • Electric Permit Application3
  • Alteration / Remodel (Residential)2
  • Additions1
  • Building Permit Request: Commercial Alteration/Remodel1
  • Mechanical / Refrigeration Permit Application1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 6, 2026Building Permit Request: Commercial Alteration/RemodelBuilding is 3250 ft. The existing footprint will remain the same. The remodel includes, new foundation footers for the floor svstem. and new foundation for two Gaston County$150,000
Jun 6, 2025Electric Permit ApplicationUpgrade from a 100 amp service to a 200 amp serviceLenoir County—
Mar 19, 2025Mechanical / Refrigeration Permit ApplicationChange out a gas package unitLenoir County—
Feb 24, 2025Electrical Permit ApplicationPanel replacementGreene County—
Oct 30, 2024Electric Permit Applicationchange out 200-amp inside and outside serviceLenoir County—
Oct 21, 2024Electric Permit Applicationreconnect electrical to existing disconnectLenoir County—
Sep 17, 2024Electrical Permit Applicationinstall 22kw generator with auto transfer switchGreene County—
Jul 17, 2024Electrical Permit Application200-amp serviceGreene County—

Permit status

Where its permits stand, as the departments report them.

  • Completed25
  • Stop work ordered8
  • Active1
  • Issued1
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.