Contractor · General building

Ponce Construction & Restoration

36 building permits since 2020 in Santa Fe city, NM — $2,823,273 in reported job value over 32 permits that state one.

Building permits
36
Reported job value
$2.8M
Active
2020–2026
Latest permit
Oct 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Fe city, NM36

Permits by year

By issue date (application date where there is none).

07.515
15
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20202
20213
20221
20237
202415
20252
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing18
  • Remodels11
  • Plumbing6
  • Gas5
  • Bathrooms5
  • Windows & doors4
  • HVAC3
  • Additions3
  • Demolition2
  • Electrical2

Permit types

As the building departments classify them.

  • Alterations with Exterior Changes to Single Family Detached Dwelling5
  • Express Permit Application - Residential5
  • Residential Plumbing/GasTrade Permit5
  • Residential Express- Re-roof4
  • Commercial Express- Re-roof3
  • Express Permit Application - Commercial3
  • Residential Mechanical Trade Permit3
  • Building (Residential) Additions - Addition2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 23, 2026Alterations with Exterior Changes to Single Family Detached DwellingINTERIOR FULL BATHROOM REMODEL, REPLACE 2 WINDOWS ON NORTH SIDE, RELOCATED WASHER & DRYER, STUCCO REPAIR AROUND WINDOWS APPLIED STUCCO COLOR COAT TO ALL EXTERIOSanta Fe City$65,000
Feb 25, 2026Residential Mechanical Trade PermitNew rough in and tap of of baseboards heating systemSanta Fe City$7,000
Feb 25, 2026Residential Plumbing/GasTrade PermitNew rough in and tap out on yard line gas, gas line rough in, new rough in and tap out on master bathroom, Guest bathrooms also a and laundrySanta Fe City$8,000
Feb 23, 2026Residential Mechanical Trade PermitNew baseboard heating zones and a whole new boiler rough in for whole houseSanta Fe City$8,000
Feb 23, 2026Residential Plumbing/GasTrade PermitNew plumbing tap out on master and guest bathrooms also moved laundry about 20’ away. New gas line rough in and gas line yard line.Santa Fe City$8,000
Jan 15, 2026Permanent SignINSTALL SIGN ON WALL FACING PASEO DE PERALTASanta Fe City$265
Aug 27, 2025Residential Express- Window/Door ReplacementREPLACE EXISTING WINDOWS FOR VINYL (13 SLIDING WINDOWS ENERGY STAR) INTERIOR REPAIR AND PATCH STUCCO AFTERSanta Fe City$23,000
Aug 15, 2025Alterations with Exterior Changes to Single Family Detached DwellingREPAIR FIRE DAMAGE INSULATION DRYWALL PLASTER EXTERIOR STUCCO (RESTUCCO)Santa Fe City$54,621

Permit status

Where its permits stand, as the departments report them.

  • Completed28
  • Void3
  • Issued2
  • Cancelled2
  • Paid1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.