Contractor · Electrical

Peter Burr

36 building permits since 2000 in Canton town, MA; Middleborough town, MA and Abington town, MA, across 4 counties — $290,471 in reported job value over 26 permits that state one.

Building permits
36
Reported job value
$290.5K
Active
2000–2026
Latest permit
Oct 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Canton town, MA5
  • Middleborough town, MA5
  • Abington town, MA3
  • Bridgewater Town city, MA3
  • Cohasset town, MA2
  • Quincy city, MA2
  • Marshfield town, MA2
  • Plymouth town, MA2
  • Barnstable Town city, MA1
  • Brewster town, MA1

Permits by year

By issue date (application date where there is none).

0510
9
20002020202220242026*
* 2026 is year to date.
View as table
YearPermits
20001
20041
20201
20211
20224
20236
20249
20257
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical34
  • Remodels6
  • Generators3
  • Additions2
  • Bathrooms2
  • Battery storage1
  • Kitchens1
  • Electric meters1
  • New construction1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Electrical Permit17
  • ELECT.9
  • Electrical Permit Application3
  • Building Permit2
  • Electrical Permit RESIDENTIAL One and Two Family2
  • *Electrical Permit Online1
  • Franklin Electrical Permit1
  • Wiring Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 26, 2026Electrical PermitRemoving outside light fixtures and receptacles for new siding. We are also adding an 18KW generator with atomatic Transfer.Plymouth Town$12,000
Oct 5, 2026Franklin Electrical PermitWiring new 18KW whole house generator with automatic transfer switch.Franklin Town City$12,000
Oct 1, 2026ELECT.—Sandwich Town—
Aug 25, 2026ELECT.Replace low-voltage smoke detectors with new line voltage hardwired battery back up onesBridgewater Town City$1,800
Aug 7, 2026Electrical Permit ApplicationPull meter socket for sidingAbington Town$300
Jul 27, 2026ELECT.added 1 double duplex receptacle and 2 new vanity lights in master bath.Rockland Town$800
Dec 20, 2025ELECT.Emergency service repair. Replace riser that was torn off of house during stormBridgewater Town City$1,000
Dec 9, 2025Electrical PermitBasement finish, sub panelPlymouth Town$8,000

Permit status

Where its permits stand, as the departments report them.

  • Completed21
  • Closed6
  • Active5
  • Issued4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.