Contractor · HVAC

PERFORMANCE MECHANICAL GROUP

36 building permits since 2014 in Tacoma city, WA; Marysville city, WA and Seattle city, WA, across 3 counties — $2,501,275 in reported job value over 34 permits that state one.

Building permits
36
Reported job value
$2.5M
Active
2014–2026
Latest permit
Aug 17, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Tacoma city, WA27
  • Marysville city, WA6
  • Seattle city, WA2
  • Monroe city, WA1

Permits by year

By issue date (application date where there is none).

0510
9
2015202220242026*
* 2026 is year to date.
View as table
YearPermits
20142
20153
20215
20227
20233
20243
20259
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC28
  • Heat pumps10
  • Gas7
  • Electrical7
  • Remodels6
  • Roofing2
  • Telecom2
  • Additions1
  • Bathrooms1
  • Plumbing1

Permit types

As the building departments classify them.

  • Building27
  • MECHANICAL4
  • Commercial2
  • ELECTRICAL2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 17, 2026BuildingReplace one existing packaged rooftop gas/electric unit with new, in the same place. Install one new adapter curb for mounting of the new unit on the existing rTacoma City$23,785
Jun 9, 2026BuildingDemolish existing HVAC & install new HVAC systems per attached plans for a 2-story building renovation project.Tacoma City$228,000
Apr 7, 2026BuildingInstall one 3-ton split system outdoor heat pump unit and one indoor wall hung ductless unit for unmanned telecom shelter. Install refrigerant piping. Related tTacoma City$13,770
Dec 22, 2025BuildingREPLACE FIVE EXISTING PACKAGED ROOFTOP HEAT PUMP UNITS WITH NEW, IN THE SAME PLACE. INSTALL ONE NEW ADAPTER CURB FOR MOUNTING OF THE NEW UNIT ON THE EXISTING ROTacoma City$87,917
Dec 16, 2025BuildingReplace 5 heat pumps at Cedar Plaza Building.Tacoma City$79,407
Nov 24, 2025BuildingProvide & install new heat recovery VRF HVAC system, energy recovery ventilators (ERV), associated air distribution, & HVAC controls for a new 2-story medical oTacoma City$275,000
Oct 10, 2025BuildingREPLACE ONE EXISTING PACKAGED ROOFTOP GAS/ELECTRIC UNIT WITH NEW, IN THE SAME PLACE. INSTALL ONE NEW ADAPTER CURB FOR MOUNTING OF THE NEW UNIT ON THE EXISTING RTacoma City$17,923
Oct 2, 2025BuildingAdd (1) additional fan coil to an existing heat recovery VRF system to create new HVAC zone. Modify existing air distribution to accommodate new HVAC zone. AUTOTacoma City$24,500

Permit status

Where its permits stand, as the departments report them.

  • Finaled24
  • Issued4
  • Expired4
  • Completed2
  • Active1
  • Reviews in progress1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.