Contractor · HVAC
SIERRA VALLEY MECHANICAL
413 building permits since 2020 in Sacramento city, CA; Sacramento County, CA and Elk Grove city, CA, across 2 counties — $5,498,342 in reported job value over 406 permits that state one.
- Building permits
- 413
- Reported job value
- $5.5M
- Active
- 2020–2026
- Latest permit
- Oct 16, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA256
- Sacramento County, CA84
- Elk Grove city, CA50
- Citrus Heights city, CA17
- Folsom city, CA4
- Davis city, CA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 6 |
| 2021 | 37 |
| 2022 | 77 |
| 2023 | 78 |
| 2024 | 61 |
| 2025 | 43 |
| 2026 (YTD) | 109 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC222
- Electrical178
- Gas143
- Heat pumps130
- EV chargers66
- Plumbing58
- Water heaters47
- Solar8
- Roofing7
- Battery storage4
Permit types
As the building departments classify them.
- Single Family184
- MISR62
- Apts 5+43
- ONLINE VEHICLE CHARGING PERMIT20
- MISC16
- ONLINE RESIDENTIAL MECHANICAL15
- HVAC9
- Electrical7
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 16, 2026 | ONLINE RESIDENTIAL MECHANICAL | Replace 4 ton hvac system - gas to heat pump | Elk Grove City | $19,242 |
| Oct 7, 2026 | ONLINE VEHICLE CHARGING PERMIT | 40 amp circuit, breaker + hardwired EV charger | Elk Grove City | $2,665 |
| Oct 6, 2026 | ONLINE VEHICLE CHARGING PERMIT | 40 amp circuit, breaker + 32 amp hardwired EV charger | Elk Grove City | $2,880 |
| Sep 25, 2026 | ONLINE VEHICLE CHARGING PERMIT | 40 amp circuit and breaker + hardwired ev charger | Elk Grove City | $3,201 |
| Sep 23, 2026 | Apts 5+ | REPLACE 3 TON HVAC SYSTEM, LIKE FOR LIKE. NO DUCTS ADDED OR CHANGED. THE EXISTING INDOOR UNIT IS IN A SOFFIT IN THE CEILING. THE NEW UNIT WILL BE INSTALLED IN T | Sacramento | $9,124 |
| Sep 23, 2026 | Single Family | E-Permit: existing panel 125 Amps - Overhead service, new main panel 200 Amps, Replacement weather head/masthead work, main breaker replacement. | Sacramento | $4,750 |
| Sep 23, 2026 | Single Family | EV Charger Permit: Install a 40 amp circuit and breaker for an EV charging station in the garage. 32 amp hardwired EV charger is included. Water conserving fixt | Sacramento | $1,500 |
| Sep 22, 2026 | ONLINE VEHICLE CHARGING PERMIT | 40 amp circuit, breaker, outlet and hardwired EV charger | Elk Grove City | $3,255 |
Permit status
Where its permits stand, as the departments report them.
- Issued278
- Completed68
- Closed38
- Finaled19
- Active4
- Expired2
- Cancelled2
- Reviews in progress2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.