Contractor · Electrical

Hage Construction Co

415 building permits since 2017 in Minneapolis city, MN — $1,274,420 in reported job value over 415 permits that state one.

Building permits
415
Reported job value
$1.3M
Active
2017–2026
Latest permit
Sep 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Minneapolis city, MN415

Permits by year

By issue date (application date where there is none).

04080
75
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
201724
201834
201953
20208
202159
202275
202338
202448
202538
2026 (YTD)38

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical80
  • HVAC79
  • Plumbing79
  • Grading & excavation7
  • Windows & doors4
  • Demolition3
  • Remodels2
  • Accessory dwelling units1
  • Additions1

Permit types

As the building departments classify them.

  • Res407
  • Commercial8

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 2, 2026Res(DMH - PDox) RECONSTRUCT FRONT & REAR ENTRY WITH NEW CONCRETE LANDING & STEPS TO DUPLEX & NEW PIER FOOTINGS. AN INSPECTION IS REQUIRED BEFORE CONCRETE IS POUREDMinneapolis City$5,000
Aug 24, 2026ResREPLACE FRONT STEPS (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AMinneapolis City$3,500
Aug 24, 2026ResREMOVE AND REPLACE CONCRETE STOOP LANDING AND STEPS ON FRONT ELEVATION OF EXISTING SINGLE FAMILY HOUSE IN EXACT LOCATION USING SAME DIMENSIONS. AAJ (PROJECT DOXMinneapolis City$2,500
Aug 24, 2026ResREMOVE AND REPLACE CONCRETE STOOP LANDING AND STEPS ON REAR ELEVATION OF EXISTING SINGLE FAMILY HOUSE IN EXACT LOCATION USING SAME DIMENSIONS. AAJ (PROJECT DOX Minneapolis City$2,500
Aug 24, 2026ResREMOVE AND REPLACE FRONT STEPS (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, Minneapolis City$2,500
Aug 18, 2026ResREPLACE FRONT STOOP/STEPS AT SFD - REMOVE EXISTING AND INSTALL NEW CONCRETE LANDING AND STAIRWAY (3 12" STAIR TREADS/4 RISERS) TO SIDEWALK - SAME SIZE/LOCATION Minneapolis City$2,500
Aug 18, 2026ResCONSTRUCT/REPLACE STOOP AND STEPS ON FRONT OF EXISTING SFD. MINIMUM LANDING SIZE 36" BY 36" HAND RAIL MUST BE 34" TO 38" ABOVE NOSING OF TREADS (REQUIRED IF 4 OMinneapolis City$2,500
Aug 17, 2026ResREPLACE FRONT STEP AND STOOP (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLMinneapolis City$4,000

Permit status

Where its permits stand, as the departments report them.

  • Closed310
  • Issued54
  • Expired35
  • Active10
  • Cancelled6

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.