Contractor · General building
Daniel Kinsella
36 building permits since 2017 in Newport city, RI; Little Compton town, RI and Middletown town, RI — $10,589,549 in reported job value over 36 permits that state one.
- Building permits
- 36
- Reported job value
- $10.6M
- Active
- 2017–2026
- Latest permit
- Oct 22, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Newport city, RI17
- Little Compton town, RI9
- Middletown town, RI9
- Tiverton town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 2 |
| 2018 | 5 |
| 2019 | 4 |
| 2021 | 2 |
| 2022 | 3 |
| 2023 | 3 |
| 2024 | 2 |
| 2025 | 5 |
| 2026 (YTD) | 10 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels10
- Bathrooms7
- Demolition7
- Windows & doors7
- Kitchens5
- Roofing4
- Additions4
- New construction4
- Pools & hot tubs3
Permit types
As the building departments classify them.
- Building Permit31
- Demolition Permit5
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 22, 2026 | Building Permit | Remove existing end-of-life-red cedar roofing and replace with designer architectural asphalt shingles.Install new copper valleys,flashing,caps, and associated | Newport City | $100,000 |
| Oct 5, 2026 | Building Permit | NO EXTERIOR WORK Renovate 3 bathrooms with new sheetrock and all finishes. INTERIOR WORK ONLY | Newport City | $130,000 |
| Oct 1, 2026 | Building Permit | Remove cement floor and interior finishes in Garage for structural exploratory purposes. No structural framing components to be removed or disturbed. | Little Compton Town | $10,000 |
| Sep 15, 2026 | Building Permit | Demo of existing rear deck and construct a new additon to rear of existing kitchen with crawl space below - Change of contractor see permit B-26-166 | Newport City | $200,000 |
| Jun 1, 2026 | Building Permit | Remove finishes, plaster and lath on second floor north wing as indicated on plans - INTERIOR WORK ONLY | Newport City | $20,000 |
| Apr 13, 2026 | Building Permit | Construct new home | Newport City | $800,000 |
| Mar 14, 2026 | Building Permit | Cut rough openings info the exisiting first floor and second floor to allow for the insallation of a 2 stop residential elevator. Frame partition walls areound | Newport City | $20 |
| Feb 3, 2026 | Building Permit | Construct new 6 bed 3 1/2 bath (including basement space) 2 story structure with decks on existing poured foundation. Install 12 x 8.5' pool | Middletown Town | $950,000 |
Permit status
Where its permits stand, as the departments report them.
- Active18
- Completed18
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.