Contractor · Electrical

BEAON CONTRACTING LLC

36 building permits since 2022 in Arlington County, VA; Howard County, MD and Rockville city, MD, across 3 counties.

Building permits
36
Reported job value
—
Active
2022–2026
Latest permit
Nov 3, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Arlington County, VA33
  • Howard County, MD2
  • Rockville city, MD1

Permits by year

By issue date (application date where there is none).

01020
17
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20231
20247
202510
2026 (YTD)17

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical36
  • EV chargers23
  • Remodels2
  • Additions2
  • Windows & doors1
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical33
  • Residential Electrical Addition Alteration Permit2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 3, 2026ElectricalInstall EV charger. Install 40ft of 6/2 MC cable from main panel in basement. Install 60A GE breaker. Charger configured to 48 amps, hardwired, and installed inArlington County—
Oct 30, 2026ElectricalInstall EV charger. Install 40ft of 6/2 MC cable from main panel in basement. Install 60A Eaton CH breaker. Charger configured to 48 amps, hardwired, and instalArlington County—
Oct 30, 2026ElectricalInstall EV charger. Install 10ft of 6/2 MC cable from main panel in garage. Install 60A Square D Homeline breaker. Charger configured to 48 amps, hardwired, andArlington County—
Oct 9, 2026ElectricalInstall EV charger. Install 20ft of 6/2 MC from main panel in garage . Install 60A BRH breaker. Charger configured to 48 amps, hardwired, and installed in the gArlington County—
Oct 9, 2026ElectricalInstall EV charger. Install 30ft of 6/2 MC from main panel in basement . Install 60A CH breaker. Charger configured to 48 amps, hardwired, and installed in the Arlington County—
Oct 4, 2026ElectricalInstall EV charger. Install 20ft of 6/2 MC from main panel in basement . Install 50A Siemens breaker. Charger configured to 40 amps, hardwired, and installed onArlington County—
Sep 13, 2026ElectricalInstall EV charger. Install 70ft of 6/2 MC from main panel in home. Install 50A GE breaker. Charger configured to 40 amps, hardwired, and installed on the exterArlington County—
Aug 13, 2026ElectricalInstall EV charger. Install 65ft of 6/2 MC from main panel in basement . Install 60A Eaton BRH breaker. Install two 15 amp tandem breaker. Charger configured toArlington County—

Permit status

Where its permits stand, as the departments report them.

  • Finaled30
  • Pending3
  • Completed2
  • Closed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.