Contractor · Specialty (solar, fire, telecom)

Todd Riley

37 building permits since 2019 in Providence city, RI; Barrington town, RI and Cranston city, RI, across 5 counties — $864,783 in reported job value over 22 permits that state one.

Building permits
37
Reported job value
$864.8K
Active
2019–2026
Latest permit
Oct 15, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Providence city, RI5
  • Barrington town, RI4
  • Cranston city, RI3
  • Pawtucket city, RI3
  • Hopkinton town, RI3
  • South Kingstown town, RI3
  • Westerly town, RI3
  • Bristol town, RI2
  • Warwick city, RI2
  • Richmond town, RI2

Permits by year

By issue date (application date where there is none).

02040
34
2019202420252026*
* 2026 is year to date.
View as table
YearPermits
20191
202434
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar32
  • Electrical12
  • Battery storage9
  • EV chargers1
  • Electric meters1

Permit types

As the building departments classify them.

  • Solar Permit21
  • Electrical Permit10
  • 9) Solar Permit3
  • Application for Building Permit1
  • EG Solar Permit1
  • Stonington Electrical Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 15, 2026Application for Building Permit26x36 metal garageGriswold Town$79,560
May 19, 2025Solar Permit—Narragansett Town—
Oct 18, 2024Solar Permit—Providence City$41,450
Oct 1, 20249) Solar PermitInstallation of an additional 10-400w panels to an existing 13-400w solar rooftop PV system and all required disconnects.Cranston City$18,890
Sep 22, 2024Solar PermitInstallation of 42-425w panel rooftop mounted net metered solar with all required disconnectsPawtucket City$49,825
Sep 22, 2024Solar PermitInstallation of 20-425w panels, net-metered roof top solar with all required disconnectsPawtucket City$29,110
Sep 22, 2024Solar Permit—North Kingstown Town—
Sep 3, 2024Solar Permit—Hopkinton Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed35
  • Active2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.