Contractor · General building

ROMAN CATHOLIC BISHOP OF MONTEREY CA

37 building permits since 1993 in Santa Cruz County, CA.

Building permits
37
Reported job value
—
Active
1993–2026
Latest permit
Aug 12, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA37

Permits by year

By issue date (application date where there is none).

02.55
5
199420012006201520222026*
* 2026 is year to date.
View as table
YearPermits
19931
19941
19981
20004
20011
20021
20031
20065
20111
20135
20151
20161
20191
20225
20242
20253
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing7
  • HVAC6
  • Electrical5
  • Solar4
  • Remodels4
  • Windows & doors4
  • Gas2
  • Kitchens2
  • Bathrooms2
  • Plumbing2

Permit types

As the building departments classify them.

  • Building37

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 12, 2026BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
Apr 17, 2026BuildingConstruction Change Document #3 to Permit B-238038 to include the following: Replace (E) lighting in assembly space with (N) lighting & associated electrical chSanta Cruz County—
Apr 14, 2026BuildingInstall a roof mount (46.64)kW, (106) modules photovoltaic electrical system at existing church "Roman Catholic Bishop of Monterey". The Building Inspector may Santa Cruz County—
Sep 8, 2025BuildingConstruction Change Document #2 to Permit B- 238038 to include the following: E xterior work approved by DISC251229 including removing and replacing existing doSanta Cruz County—
Jun 18, 2025BuildingConstruction Change Document #1 to Permit B-238038 to include the following: Interior remodel only to rearrange portions of interior floor plan, no added squareSanta Cruz County—
Apr 14, 2025BuildingInstall a (18) kW Generac air-cooled generator with a 100A transfer switch at an existing Church. Connect to existing gas line from building gas riser. BC FPD /Santa Cruz County—
Nov 8, 2024BuildingCentral FPD / LRA DIS231238 Proposal to construct two connected 672 square foot outdoor mausoleums resulting in a total 1,344 square feet of new structure.Santa Cruz County—
Aug 27, 2024BuildingCentral FPD/LRA Repairs due to tree damage to existing Markey Community Center at Resurrection Catholic Church in Aptos. Permit includes accessibility upgrades,Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed35
  • Not stated2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

ROMAN CATHOLIC BISHOP OF MONTEREY CA — Building Permits & Contractor Profile | Buildstats